🚨 Our Letter to Barnet—Urging Councillors to Vote Against the Reckless Site 28 in the Local Plan – Save Edgware Bus Station and Stop Bus Garage Fire Risk! 🚨

On 4 March, Barnet Council will vote on a reckless and unsound Local Plan that allocates 2,316 high-rise flats onto Edgware Underground Station, 68-seater Bus Station, 200-Bus Garage and a Nature Reserve (Site 28). This reckless decision ignores fire safety warnings from the London Fire Brigade (LFB), compromises critical transport infrastructure, and disregards overwhelming public opposition from 6,000+ residents.

🚨 Barnet’s Cabinet pushed through the Local Plan on 5 February 2025, despite strong objections from residents, transport experts, and community groups. 

💥 We have emailed ALL Councillors to urge them to  vote against this dangerous Local Plan. 

📢 SHARE THIS POST – Let everyone know what’s happening.

Barnet may have ticked all the boxes, but they have failed morally. We will hold every councillor accountable by publishing their vote. 

Letter to All Barnet Councillors, Date: 14 February 2025

Vote Against the Barnet Local Plan and be Accountable – Save Edgware Bus Station and Prevent Another Grenfell-Like Fire Risk

Dear Barnet Councillors, 

Ahead of the final vote on the Barnet Local Plan on 4 March, we remind you of your accountability to the residents you serve and the significant political consequences of your decision, particularly regarding Site 28.
Barnet Council is on the verge of approving a Local Plan that defies logic—allocating 2,316 housing units directly on top of:
  • Edgware Underground Station and live tracks
  • A 68-seater bus station
  • A 200-bus capacity garage and
  • A protected nature reserve
This reckless decision ignores fire safety warnings from the London Fire Brigade (LFB), compromises critical transport infrastructure, and disregards overwhelming public opposition from 6,000+ residents.
We urge Labour councillors to vote with their conscience against this Local Plan, standing with Edgware residents in the name of fairness and fundamental integrity, rather than turning their backs on the community.
Labour councillors must uphold their manifesto promise to reject tower block blight. In 2022, Labour won control of Barnet Council after pledging to stand up to developers, say no to tower block blights, and enforce stricter height and density policies. Instead, they failed to reverse the Local Plan, kept Site 28, and backed high-rise development in Edgware—breaking their election manifesto.
If Site 28 is approved, those who vote in favour will bear full responsibility for the reputational damage and electoral consequences that follow. Their names will be published to our members, and the public will be informed of who stood with residents and who sided with developers.
While the Barnet Planning Department may have ticked all the legal boxes, it has failed morally by pushing forward a reckless and unsound Local Plan that will fundamentally damage Edgware’s future against the wishes of its residents. We urge Barnet Councillors to reject it—not only to stand with your community but to protect your own reputation.

  1. Grenfell: Have Lessons Been Ignored? A Catastrophe Ten Times Worse Awaits
The Grenfell Tower disaster was a tragic failure of governance and fire safety regulations, where concerns were ignored until it was too late. Among the key recommendations from the Grenfell Inquiry was the need for stricter fire safety planning and risk assessments in high-rise developments.
Site 28’s allocation directly contributed to Ballymore’s plan to relocate the 200-bus garage underground beneath thousands of high-rise homes. This underground EV bus garage poses extreme fire risks, including:
  • Structural collapse from high-intensity EV battery fires
  • Toxic vapor explosions in an enclosed space
  • Severe safety challenges for fire response and evacuation
The London Fire Brigade (LFB) has already objected to these fire safety risks, yet Barnet Council pushes forward blindly. If Grenfell was a tragedy caused by ignored warnings, Site 28 will be ten times worse—with thousands of people living on top of a ticking time bomb.
It is your responsibility to ensure Barnet does not repeat history by approving a Local Plan with clear fire safety failings.

2. Demolishing the Bus Station Will Cause Chaos on Station Road
  • The 2.67-hectare bus station and garage site is allocated for 757 homes, removing essential transport infrastructure.
  • The direct result of this allocation led to the shrinking of the bus station from a purpose-built enclosed 68-seater facility to a few scattered bus stops along Station Road.
  • TfL predicts a 50% increase in bus and passenger numbers, yet Barnet’s plan fails to accommodate this future demand, creating congestion, delays, and chaos.

3. Lack of Legally Required Environmental and Transport Assessments
The lack of proper assessments before allocating Site 28 raises serious concerns about the soundness and legality of the Local Plan:
  • No Environmental Impact Assessment (EIA) was conducted, violating the Environmental Assessment of Plans and Programmes Regulations 2004.
    • The impact on air quality, biodiversity, and flood risks to Deans Brook was never evaluated.
  • No Transport Impact Assessment (TIA) was conducted, violating NPPF Paragraph 104.
    • The closure of Edgware Bus Station and forced underground garage relocation was never studied for feasibility, safety, or operational effectiveness.
    • TfL’s operational needs for bus infrastructure and future 50% capacity expansion were ignored, despite the site being 100% TfL-owned land.
Proceeding with Site 28 without these legally required assessments reinforces the perception that key planning decisions are being made without transparency or due diligence.

4. Edgware Residents Were Not Properly Consulted on Site 28
The consultation on Site 28 (Edgware Underground & Bus Station land) was deeply flawed and failed to properly engage local residents. Despite Edgware being designated as Barnet’s only Major Town and taking on a disproportionately large share of the housing target, Barnet Council held consultation meetings in Hendon, Finchley, and Chipping Barnet—but not in Edgware itself.
Key documents, including the Supplementary Planning Document (SPD) and Local Plan consultations, failed to:
  • Mention tower block height limits.
  • Fully assess the impact on transport infrastructure.
  • Notify residents within 100 yards of the site, leading to only 27 objections initially, compared to over 6,000 objections once residents became aware in 2023.
The SPD and Regulation 19 Local Plan consultation took place during COVID-19, further limiting public awareness.
While the Council may have followed the legal process, the consultation failed its moral duty to properly inform and engage Edgware residents, the very community most affected by this overdevelopment.

5. Over 6,000 Residents Formally Objected to Ballymore’s Application, Which Was Based on Site 28
The Ballymore Edgware Town Centre application is based on this unsound Site 28 allocation, and the public opposition to this plan is unprecedented:
  • The application proposes 3,828 new homes, with two-thirds of Site 28 designated for housing.
  • Barnet’s planning portal malfunctioned during the consultation period, yet the application still received over 6,000 objections—more than double the previous record (2,500).
  • This widespread opposition reflects the deep flaws in Site 28’s allocation and growing resident frustration with Barnet’s planning process.
If Barnet Council continues to ignore this overwhelming opposition, it will further undermine public trust in its planning decisions.

6. National Media Scrutiny and Public Trust Risks
If Barnet Council does not correct the Site 28 allocation, the reputational risks will escalate further.
This issue has already been widely reported by major national media outlets, including:
The Barnet Council’s  refusal to acknowledge these concerns has already fueled public outrage, and if Barnet Council continues down this path, residents will not accept being ignored.
Public trust in the Council’s planning decisions is already fragile, and any perceived disregard for safety concerns and public objections will only intensify scrutiny and reputational harm.

7. Urgent Request for Reassessment of Site 28 Before Adoption
Given these concerns, we urge Barnet Council to take immediate steps to address the serious risks and procedural flaws surrounding Site 28:
  1. A formal response from Barnet Council explaining why the LFB’s objections were ignored during the MM consultation.
  2. A justification for why Site 28 was allocated without an Environmental or Transport Impact Assessment.
  3. A reassessment of Site 28’s allocation before the Local Plan adoption.
If Barnet Council proceeds without addressing these issues, it will face continued public backlash, media scrutiny, and the risk of legal challenge for approving an unsound Local Plan.
This is Barnet Council’s opportunity to demonstrate accountability, transparency, and responsiveness to residents’ concerns.
We request a formal response confirming the next steps for reassessment.
 
Attachments:

Emails of all the Barnet councillors:

cllr.s.conway@barnet.gov.uk, cllr.K.Gurung@barnet.gov.uk, cllr.a.ioannidis@barnet.gov.uk, cllr.z.zubairi@barnet.gov.uk, cllr.n.narenthira@barnet.gov.uk, cllr.h.khalick@barnet.gov.uk, cllr.g.sargeant@barnet.gov.uk, cllr.S.Gordon@barnet.gov.uk, cllr.n.mearing-smith@barnet.gov.uk, cllr.L.Wakeley@barnet.gov.uk, cllr.s.wardle@barnet.gov.uk, cllr.l.gurung@barnet.gov.uk, Cllr.V.Duschinsky@Barnet.gov.uk, cllr.e.simberg@barnet.gov.uk, cllr.l.jajeh@barnet.gov.uk, cllr.r.cornelius@barnet.gov.uk, cllr.a.cornelius@barnet.gov.uk, cllr.c.stock@barnet.gov.uk, cllr.P.Lemon@barnet.gov.uk, cllr.T.Vourou@barnet.gov.uk, cllr.G.Monasterio@barnet.gov.uk, cllr.N.Young@barnet.gov.uk,  cllr.t.roberts@barnet.gov.uk, cllr.z.beg@barnet.gov.uk, cllr.R.Barnes@barnet.gov.uk, cllr.M.Haylett@barnet.gov.uk, cllr.d.longstaff@barnet.gov.uk, cllr.g.innocenti@barnet.gov.uk, cllr.M.Perlberg@barnet.gov.uk, cllr.a.clarke@barnet.gov.uk, cllr.a.schneiderman@barnet.gov.uk, cllr.p.cohen@barnet.gov.uk, cllr.b.rawlings@barnet.gov.uk, cllr.r.houston@barnet.gov.uk, cllr.E.Rose@barnet.gov.uk, cllr.g.cooke@barnet.gov.uk,  cllr.E.David@barnet.gov.uk, cllr.S.Radford@barnet.gov.uk, cllr.c.farrier@barnet.gov.uk, cllr.a.mittra@barnet.gov.uk, cllr.a.moore@barnet.gov.uk, cllr.e.greenspan@barnet.gov.uk, cllr.d.thomas@barnet.gov.uk, cllr.j.grocock@barnet.gov.uk, cllr.p.coakleywebb@barnet.gov.uk, Cllr.L.Lusingu@barnet.gov.uk, cllr.M.Mire@barnet.gov.uk, Cllr.R.Grover@barnet.gov.uk, Cllr.D.Cohen@barnet.gov.uk, cllr.p.zinkin@barnet.gov.uk, cllr.m.shooter@barnet.gov.uk, cllr.J.Conway@barnet.gov.uk, cllr.a.prager@barnet.gov.uk, cllr.p.edwards@barnet.gov.uk, cllr.E.Whysall@barnet.gov.uk, cllr.d.rich@barnet.gov.uk, cllr.k.mcguirk@barnet.gov.uk, cllr.R.Chakraborty@barnet.gov.uk, cllr.A.Bilbow@barnet.gov.uk, cllr.E.Ambe@barnet.gov.uk, Cllr.L.Woodcock-Velleman@Barnet.gov.uk, cllr.a.hutton@barnet.gov.uk,

 
 

3 Comments

  1. Its absolutely appalling how the Barnet Council has ignored all our letters/ emails etc objecting to their ridiculous plans! How can they legally go ahead without addressing our issues???

  2. The proposed local plan contradicts the Mayor of Londons plan on building heights which should be compatable to the surrounding area. There was no requirement to remove the building height statement in the previous version of the plan.

  3. I am appalled at the plan which would cause major disruption and increase traffic with more bus stops in station Road and loss of parking and Broadwalk Shopping Centre. As elderly residents, especially ,this would cause dreadful disruption and lack of necessary facilities and ability to live in any kind of peace in the last years of our lives. This is not a matter of ‘Not in my back yard’ but allowing disruption of life and dangerous overcrowding especially to those of us who live in the Edgware Station area.

Leave a Reply

Your email address will not be published. Required fields are marked *