Towers Above. EV Buses Below. Fire Brigade Says No.

London Fire Brigade has formally objected. This kind of structure has never been built in the UK. There are no Building Regulations for it. And the existing Edgware Bus Station — used by 23,000 passengers a day — is being demolished to make way for it.

Save Our Edgware is non-party political. We welcome support from residents of all political views.

The Mayor of London approved this plan. Despite the London Fire Brigade's formal objection, despite over 7,000 public objections to Barnet, and despite a 3,000-signature petition to save the bus station, the Mayor declined to intervene. The GLA confirmed its Stage 2 decision on 30 March 2026, allowing the scheme to proceed.

What is being built — and where

As part of the Edgware Town Centre redevelopment (application 24/2686/OUT, by Ballymore and Places for London, the property arm of Transport for London), the existing bus station, bus garage and surface bus stands would be demolished and replaced with:

  • An underground electric bus garage housing at least 190 lithium-ion electric buses;
  • Sited directly beneath nine residential tower blocks of up to 29 storeys;
  • With the existing 18 surface bus stands relocated into that underground structure.
  • 190EV buses planned underground
  • 29storeys above the garage
  • 9towers structurally linked to garage
  • 0UK precedents for this design

Why the London Fire Brigade objected

The London Fire Brigade has raised serious concerns since 2022, and those concerns have not been withdrawn. In November 2022 the LFB assessed the proposal and concluded it was "not viable as laid out in the proposals supplied". That position was confirmed unchanged in December 2023 and again in August 2024.

In its formal objection of 1 October 2024, the LFB went further — warning of risks of structural collapse and the potential for toxic vapour cloud explosions from a lithium-ion battery incident in an enclosed underground space. The full text is available here.

The structural integrity of many of the blocks above the bus garage are intrinsically dependent on the structural integrity of the bus garage below… the potential for so many EV buses poses risks that are not fully understood by the industry at this point in time.

Significantly, it has not been satisfactorily demonstrated that the proposed measures are appropriate given the potential for an incident involving an EV emitting a toxic vapour, and the subsequent potential for a vapour cloud explosion if that cloud is confined.

— London Fire Brigade, formal objection, 1 October 2024

The LFB also warned that the garage had been approached "in the same way as a conventional car park", failing to account for the specific hazards of electric vehicles in an enclosed underground environment. The LFB has confirmed it remains unclear whether fire testing will ever demonstrate the scheme to be viable.

This kind of structure has never been built in the United Kingdom. No Building Regulations framework currently exists to govern its safe construction. The fire-test evidence needed to demonstrate viability does not yet exist — and the LFB has said it may never exist.

And the bus station that 23,000 people use every day will be lost

Edgware Bus Station before and after — the existing enclosed sheltered interchange replaced by dispersed on-street stops
The approved scheme does not replace the bus station with a new bus station. It proposes dispersed on-street stops along Station Road and Approach Road.

Edgware Bus Station serves around 23,000 passenger movements a day across approximately 20 routes. It is fully enclosed, staffed, has 68 seats, and sits roughly five metres from a step-free Underground entrance — making it one of outer London's most important interchanges, particularly for disabled, elderly and mobility-impaired passengers.

It is not being replaced with a new bus station. The plan is dispersed on-street stops along Station Road and Approach Road. Based on the developer's own Transport Assessment data:

  • Up to 25×Increase in bus-to-Tube walking distance — from around five metres to approximately 132 metres
  • +145%Increase in overall interchange walking distance
  • +165%Increase in walking time for passengers with limited mobility
  • 35.7%Of interchange routes would require crossing the busy A5109 Station Road (today: 0%)

Edgware is one of the few step-free Underground stations in the area. A 68-seat enclosed waiting environment, five metres from the Tube entrance, would be replaced by on-street stops separated from the Underground by multiple road crossings. That change disproportionately affects the people who depend on the interchange the most.

London Mayoral Candidate for Reform Laila Cunningham visited the site

Laila Cunningham, Reform UK's London Mayoral candidate, visited Edgware to see the bus station and hear residents' concerns about the underground garage proposal. The visit drew significant interest on social media. We share it here as a record of public engagement with the issue — Save Our Edgware does not endorse any candidate or party.

Laila Cunningham at Edgware Bus Station — video thumbnail Facebook · ReelWatch & share on Facebook

Open on Facebook ↗

Media coverage

The fire safety question has been widely reported:

Sign the petition

Stop Edgware's Bus Station and Bus Garage from being demolished

A 38 Degrees petition to the Mayor of London, TfL, the GLA, Barnet Council and London TravelWatch — 3,000+ signatures and growing.

Fire safety is the single most significant concern raised by residents. The petition asks that the existing bus station and bus garage are not demolished unless and until a safe, legally deliverable and operational replacement transport hub has been secured and approved — one providing at least equivalent accessibility, safety, shelter and interchange convenience to the station in use today. It records the London Fire Brigade's fire-safety concerns about the underground garage, and the risk that the current facilities could be demolished before any replacement has been shown to be safely deliverable.

"…unless and until it is proven safe to do so."— Stop Edgware's Bus Station and Bus Garage from being demolished, 38 Degrees

Sign the petition on 38 Degrees ↗

Help us fund the legal challenge

Save Our Edgware is taking legal advice on a judicial review of Barnet's decision. A challenge of this kind costs £50,000+. Every pound goes directly to legal costs.

Donate to the legal challenge ↗ Read the full briefing

Sources and further reading