PRESS RELEASE
FOR IMMEDIATE RELEASE
16 March 2026
Barnet Council has approved and referred to the Mayor of London plans to demolish Edgware Bus Station — one of outer London’s busiest interchanges — before any safe replacement has been demonstrated to be buildable. Campaigners are calling on the Mayor to act before a two-week deadline expires.
Plans to redevelop Edgware Town Centre with 3,828 homes in towers up to 29 storeys have been referred to the Mayor of London for a final decision, triggering fresh concern from campaigners over proposals that could demolish Edgware Bus Station, one of outer London’s busiest transport interchanges.
The redevelopment scheme, promoted by Ballymore and Places for London, Transport for London’s property arm, would replace the Broadwalk Shopping Centre, Edgware Bus Station and bus garage with high-density housing and a new transport layout.
Campaigners warn the plan would allow the existing bus station to be demolished before a safe replacement has been demonstrated to be buildable.
The outline planning application was approved by Barnet Labour Council in July last year and was submitted to the Mayor of London on 11 March for the final Stage 2 decision. The Mayor now has two weeks to decide whether to allow the development to proceed, direct refusal, or take over the application.
The proposal would replace the current integrated bus station with dispersed roadside bus stops, while relocating bus stand capacity into a proposed underground electric bus garage beneath nine residential towers designed to house around 190 buses.
Edgware is a Northern line terminus serving around 23,000 bus passengers a day across Barnet, Harrow and Hertfordshire. The existing sheltered bus station allows passengers to transfer between bus and Tube within around five metres, creating one of the most direct bus to Tube interchanges in outer London.
Campaigners say the redevelopment creates a serious risk because the underground electric bus garage — essential to replacing the existing bus station — has not yet been demonstrated to be safely buildable or operable.
The London Fire Brigade has previously raised concerns about underground electric bus garage, particularly the challenges posed by lithium-ion battery fires. Despite this, the planning approval allows the existing bus station and garage to be demolished before the underground facility is proven capable of safe operation.
They warn that if the underground garage later fails to secure safety approvals, Edgware could lose its functioning bus station and stand capacity entirely.
Campaigners say they asked Barnet Council to include a simple safeguard in the Section 106 planning agreement preventing demolition of the current bus station and garage until a safe and compliant replacement is confirmed.
Barnet Council declined to include this safeguard.
Analysis based on the developer’s own Transport Assessment data suggests the proposed interchange would significantly worsen passenger journeys.
Key findings include:
• Bus-to-Tube walking distances increasing up to 25-fold — from around 5 metres to approximately 132 metres
• 35.7% of interchange routes requiring passengers to cross the busy A5109 Station Road, compared with 0% today
• Overall interchange walking distance increasing 145%
• Walking times for passengers with limited mobility increasing 165%
Edgware is also one of the few step-free Underground stations in the area, making the interchange particularly important for disabled passengers and those with reduced mobility.
Campaigners say the existing sheltered bus station with 68 seats beside the Tube entrance would be replaced by roadside stops where waiting facilities have not yet been defined.
Anuta Zack, speaking for Save Our Edgware, said:
“The mystery isn’t why residents are campaigning to save this transport hub. The mystery is why anyone would demolish a functioning London interchange without first ensuring that the replacement can actually be built safely — and why such a simple safeguard has been refused.”
Campaigners say the issue could have wider implications for London transport policy.
“If a transport hub used by 23,000 bus passengers a day can be demolished before it is ensured that a safe replacement can actually be built, that sets a worrying precedent for redevelopment of transport infrastructure across London.”
Residents have launched a petition calling for safeguards to ensure Edgware’s transport hub is not demolished unless a safe and deliverable replacement can actually be built.
With the scheme now referred to the Mayor of London, the Mayor has two weeks to make a final decision.

I am against the new redevelopment plans of the Edgware bus stop. During the rainy and cold season will be for ageing people very difficult to negocisted the busy todas without any kind of shelter