Save Our Edgware's Objections to Ballymore’s Application 24/2686/OUT

Part 1

1. Who we are

We are a group of concerned local residents.  We have been recognised as a non-statutory consultee by Barnet Council.  You can contact us or learn more about us on our website https://saveouredgware.co.uk/

We are not anti-Development.  We recognise that there is a huge housing shortage nationally which needs to be addressed.  We also understand that there are many families on the Housing waiting list who are homeless or in temporary accommodation and so are in desperate need of new social housing, so again, we do not oppose development – to an appropriate scale.  We do however oppose inappropriate development. Although there is an acknowledged need, this does not mean that any developer anywhere should be allowed to cram on their site as high a density as they can get away with.  Development schemes need to be appropriate to their location and greedy overdevelopment schemes need to be recognised for what they are.  Please let us have a development that is appropriate to this location as is still required by the NPPF and the London Plan.

2. Why we are objecting

Save our Edgware (SOE) regards the proposal to redevelop (a) The Broadwalk shopping centre and (b) it’s carpark, (c) the Edgware bus transport complex and (d) the Deansbrook Nature Reserve as being a wholly inappropriate gross overdevelopment because we will lose (a) the most important economic engine in the Town Centre, (b) the car park that keeps the whole of our thriving Town Centre functioning when many other Town Centres are seeing multiple shuttered shops, (c) see our transport interchange being drastically downgraded, and (d) suffer the sacrifice of precious biodiversity.

3. Background

The previous political administration implemented the Edgware Growth Supplementary Planning Document (SPD) with minimal consultation.  Despite this proposal being for the biggest change to Edgware in 100 years, it was pushed through with almost no consultation, flying in the face of the ‘Gunning Principles’.  Residents living with 100 yards of the subject site had no idea as to what was being thrust upon them. As a result, it attracted only 27 objections, after minimal publicity to the local community, contrasting with the 6,000+ signatures raised by SOE on our petition.

Given the lack of consultation, the first indication of these proposals that reached most local residents was after the emerging Local Plan had already been to the Inspector and was now at Major Modifications stage.

Below is a direct unedited quote (save as to the colour of the text) from the Manifesto on which the Barnet Labour Party successfully won control of the Borough in the last election in 2022.

“Development in Barnet has gone badly wrong. The Barnet Conservatives promised to stop over-development – they have not stopped it. Under the Conservatives there’s been rampant overdevelopment of completely unaffordable blocks of flats with insufficient community benefit or infrastructure, and with loss of green space. The Conservative Government is driving this overdevelopment. They are set to impose a target of around 4,000-5,000 more properties a year in Barnet. We will stand up to developers: we need more genuinely affordable family homes not tower-block blight. We will stand up to the Conservative Government and call them out on their ridiculous housing targets. We will not build or allow development on any green space. We will ensure the new Local Plan is strengthened with tougher policies on Height and Density. We will develop a low and medium rise streetscape design-led housing model using Create Streets best practice examples to stop the proliferation of tower blocks.”

An independent observer would therefore expect the current Labour administration to reverse the previous administration’s plans, but instead the opposite is happening.  The current administration is pleading that it is too late to change previous plans and instead, appear to be enthusiastically supporting it by tailoring the emerging Local Plan, apparently to facilitate these proposals.  Again, one can only guess at the reasons for this change in sentiment, but the applicants’ supporting documentation does make reference to approximately £64m of CIL payments and S106 contributions.

4. Height Bulk and Massing

The total development area is 7.9 hectares (not including the protected Nature Reserve which cannot of course be built on) and the total capacity of the indicative scheme, as revealed by the applicants’ own figures, is 10,438 persons (despite the applicants maintaining elsewhere a figure of only 7,000), not including the 463 student flats.  This gives a total just shy of 11,000 people, which equates to a population density of 139,000 people per sq. km., which compares with the current densest development in the UK (in Millharbour, London Docklands) at about 90,000 people per sq. km.  The density proposed is higher than Hong Kong or Manhattan.  

Watch 3D flyover of how the tower blocks overshadowing Edgware

Edgware is a mid-sized suburban town on the very edge of London, so this is clearly grossly disproportionate.  The NPPF maintains a presumption that new building should not be “at densities significantly out of character with the existing area”, and the London Plan says designs should reflect and enhance the unique character of the area (Policy D3) and the development’s form massing and height should suit the surrounding context (Policy D6).

Edgware is in the vast majority two or three storeys at most with just a handful of building in excess of 9 storeys, so 25 towers of 20 or more storeys will be completely out of character with the whole of the local area, including the Conservation Areas of Edgware High Street, Canons Park Estate and Watling Estate.

The Ballymore development in its current form is a violation of the Barnet Local Plan 2012, the London Plan 2021, and the NPPF, especially concerning its impact on local character, scale, and density, to be specific,  Barnet Local Plan 2012 Policy DM01: Protecting Barnet’s Character and Amenity, Policy DM05: Tall Buildings, London Plan 2021 Policy D3: Optimising site capacity through the design-led approach, and Policy D6: Housing quality and standards, and finally  National Planning Policy Framework (NPPF) Paragraph 127 and Paragraph 130, which all mandate, in one way or another that new buildings are of a design and scale that are sympathetic to the local character and history, and that they create attractive and welcoming places to live.

The proposed development by Ballymore in Edgware, with its high density and tall buildings, violate several of these policies:

  1. Character and Scale: The proposed development’s density and height (139,000 people per sq. km with buildings up to 20 stories) are significantly out of character with Edgware’s suburban context, which predominantly features two or three-story buildings. This contradicts the Barnet Local Plan’s Policy DM01 and DM05, which require developments to respect the scale, mass, and height of the surrounding area.
  2. Local Context: The London Plan’s Policy D3 and D6 suggest that such a dense and high-rise development would not positively respond to Edgware’s local distinctiveness and context. The policy requires new buildings to harmonise with the existing urban fabric, which this development does not seem to do​.
  3. Density and Appropriateness: The NPPF’s guidance on ensuring developments are sympathetic to the existing area’s character and density further underscores that the Ballymore proposal is disproportionate to the typical suburban setting of Edgware, making it likely to be considered inappropriate under these guidelines​.

5. Transport Interchange

If one was seeking to design an efficient multi-modal transport interchange centred on the existing Underground station, one would place a drop-off/pick-up facility immediately outside it so that, particularly, the less-able and the vulnerable could be dropped off or collected by, car or taxi.  Then one would place, immediately alongside the Underground station, a bus transport facility made up of three elements.

  1. a) Bus garage: Furthest away would be a bus garage where the 200 buses that currently serve Edgware could be stabled, serviced and refuelled with facilities for the staff such as toilets, canteen etc.
  2. b) Bus station: Then one would have a bus station which would provide seating for passengers (particularly the less able) in a heated enclosed secure environment, out of the elements, with timetabled indicator boards, refreshment facilities and access to public toilets near-by.  This would obviously have to be as close as possible to the Underground station, and more importantly, as close as possible to:-
  3. c)  Bus stands: The bus stands, are where buses which are about to set-off, could wait whilst their passengers embark.  Obviously one would need to keep the bus stands off the public roads so that for the good few minutes it can take for the waiting passengers to embark (particularly the less able), the bus is not impeding the flow of through traffic.  Ideally one would have room for 10 or a dozen bus stands immediately adjoining the bus station, to serve the large number of routes using Edgware, so that passengers can embark in their own time without holding anyone up.

In case you hadn’t guessed it, we are describing Edgware’s existing transport interchange. 

(See pictures below)

However, the developers are planning to demolish the current bus station and replace it with  

 

  1. An island on Station Road that only provides a open air single off- road bus stop to be used for departing services. 
  2. A separated bus stop for incoming 
  3. Moving all other bus stops to both sides of the already congested Station Road.  

We believe that having demolished the existing facilities which are bespoke-designed, on land specifically reserved only for transport purposes, the replacement will be hugely worse.  In fact, we suspect it would prove disastrous for Edgware.

Let us look at the proposals in more detail.  

  1. a) Bus garage

The sole reason TfL have given for allowing their existing bus facilities to be demolished and absorbed into the redevelopment site is because, they say, that the air quality in Station Road is poor and in order to address this, they want to remove the polluting diesel buses from their fleet to become 100% clean electric.  To this end, a major underground garage has been planned.  Let us gloss over for the moment, that digging such a vast volume of earth would require approximately 20,000 (diesel) lorry movements (10,000 each way) just to remove the spoil.  The developers’ plan was that the new electric buses could be stabled and serviced underground, and more particularly, re-charged there.  This would be the first underground electric bus garage in the UK, they proudly tell us.  The problem is though that there have subsequently been a number of disastrous fires involving electric buses, with these fires being incredibly difficult to extinguish.

The possibility of 200 such buses all ablaze underneath 25 tower blocks up to 29 storeys high with 11,000 residents, would, for the London Fire Brigade (LFB), make Grenfell like a walk in the park. 

Unsurprisingly therefore the LFB have refused to sign it off (see below section on Fire Hazard) and the developers no longer have the option of using this enormous basement for 200 electric buses.  One would have thought that this would have made them go back to the drawing-board, but No.  They have decided to soldier on with this proposal and the reason they have stated is that, given it would have been about 10 years before they could have used it for electric buses anyway, they will instead just use it for the diesel buses – with the electric buses (about 60% of the present fleet we understand) being parked on the old Broadwalk car park and that TfL will bring in enormous diesel-powered generators to charge the buses between journeys and overnight. 

Now these generators will be spewing out pollution and diesel particulates (right next to Edgware Primary School).  So much for TfL’s avowed intent to clean up the air in Edgware Town Centre. 

In addition, the noise of these generators going all night is hardly likely to endear them either to the existing residents nearby or the residents in the new tower blocks. 

The developers say that this is only temporary because they hope (fingers crossed) that technology will advance to a point where it will be possible to deal expeditiously with fires in Lithium ion batteries.  This sounds to us like wishful thinking.

  1. b) Bus station

So what do the developers propose to replace the existing enclosed, comfortable, heated secure, 68 seater and ideally placed bus station with?  As far as it has been possible to establish, they are talking in terms of an open-air bus stop with an oversailing roof, on the new proposed Station Square, with all but one other of the remaining stops moved onto the already congested Station Road. Instead of passengers being able to cross within the current bus station to change service, the proposed design would involve, as a minimum, walking along the main road traversing one and in many cases two road crossings. 

 

This fragments the transport interchange, rather than integrating it, and as it is Barnet Council’s avowed intent to see an efficient modern transport interchange, this is surely a giant step in exactly the wrong direction.  The clear driver is to maximise the area dedicated to housing, and push the public transport provision to the edge and out of the development. 

  1. c) Bus stands 

On an average day one can often see between ten and a dozen buses waiting on the stands immediately adjacent to the bus station (See photo below) so that passengers can embark at their own pace without impeding the traffic flow.  Once these bus stands are swept away, how will passengers embark on their buses?  Well it seems that there will be a need for about another 10 bus stands and they will be strung out on both sides of Station Road.  What can make room for them?  Again the answer has to be that almost all of the remaining car parking on Station Road will have to be lost so that the new bus stands can be placed on the public road (Station Road).  Allowing 5 or 10 minutes for their passengers to make the long walk from the Underground station and then board the bus, and even allowing for the new bus stands to be cut into the pavements of Station Road, , there is still going to be a huge disturbance to through traffic, indeed we think this is pretty much going to bring gridlock to Station Road.

5.1. Technical problems with Replacement Bus stands

We also have concerns regarding the proposed Station Square Interchange including operational inefficiencies and the risk of collisions between buses and pedestrians. Key concerns are: Inadequate Length of Stand F2; Proximity of second signalled crossing to Stand F2; Frequent Stops; Lane Merge Issues; Buses Obstructing Pedestrian Crossings;Insufficient Sheltered Capacity, and Stop GS2 only has capacity to hold one bus at a time. Five routes will use the stop to terminate. When a second bus turns up, it will block the road and a pedestrian crossing whilst it waits for the bus to depart. This is likely to occur as drivers will need more time at the stop to ensure their bus is empty.

These factors undermine the effectiveness of the interchange and pose significant safety risks. The Interchange will not achieve the objectives set out in the planning application.

(Editor’s note: Apologies to our Transport Planning professional  for severely truncating his detailed analysis, for space reasons.  We will make the full document available separately)

5.2. Degradation of Transport Interchange

As regards the interchange between public transport and cars/taxis (which is vital for the less able and the vulnerable) the present drop-off/pick-up system immediately in front of the Underground station and close to the bus station, works well, with minimal holdups to traffic on Station Road.  What would replace it if it were allowed to be swept away?  Once more the developers are fairly silent, but on persistent questioning it would appear that there would be space for two taxis on the new Station Square and room for three (four at the most) private cars to park temporarily 200 yards further down Station Road and out of sight from the bus stop and Underground station.  If we imagine a typical situation where a concerned daughter or son is collecting an elderly relative from the train, the driver will be unable to see when their relative has arrived and/or the passenger will be unable to tell if their son/daughter has been successful in getting one of the reserved parking spaces.  Again this is anything but an improvement on the current situation: the redevelopment serves the developers, not the public.

The loss of almost all the remaining car parking and the traffic problems in Station Road (which will impede the bus passengers as much as the cars and lorries) will be disastrous for the economy of Edgware.  

We conclude that it is totally unacceptable for TfL to move its bus stands and bus station on to public roads, at a huge cost to the public, just so that TfL can sell off the land it has vacated for redevelopment.

The developers say they are going to be delivering an improved integrated transport interchange but in fact, they will achieve the opposite.  They absolutely must not be given permission to demolish the existing facilities, which work well, without first providing sufficient information to Barnet’s Highways and Transport departments, so that an informed judgement can be made as to whether the proposed replacement arrangements are in fact an improvement, or as we suspect, a disastrous retrograde step.  

5.3. Fire Hazard

We have discovered through a response to our FOI request that the London Fire Brigade stated firmly and comprehensively that this proposal is totally non viable as detailed below:  

  1. The London Fire Brigade has assessed the proposal for an underground bus garage at Edgware requested by LB Tower Hamlets and came to the conclusion that it was not viable because of the impact of any fire caused by the lithium batteries in the electric buses catching fire. (FOI 7961.1 from London Fire Brigade about the scheme being non viable.) and articles published on The Daily Telegraph (Electric bus station fire could turn high-rise homes into ‘volcano’, residents warn) and The Sun (FIRE FEARS We’re terrified an EV charging hub will turn £1.7bn newbuild apartment blocks into a ‘VOLCANO’.), and the Barnet Post  ( London Fire Brigade Edgware EV bus garage safety warning) on the Edgware Bus Garage fire risks.
  2. At the meeting on 5 Dec 2023, the Save Our Edgware  met with London Fire Brigade Deputy Assistant Commissioner / Prevention and Protection Richard Field, Mike Dewberry (Transport Liaison and Alternative Energy) and Peter Johnson (Borough Commander for Barnet). Richard Field reported that the situation regarding the non viability of building the underground bus garage has not changed. 
  3. In the last FOI 8876.1 dated  13 Aug 2024 that “Discussions are ongoing related to the building regulations of the commercial underground car park. No new formal building regulations have been published at this time. …  The current position as provided in the letter under FOI 7961.1 (e.g. the underground bus garage is non viable) remains unchanged at present.” 
  4. There are no standards for underground garages for electric buses and commercial  vehicles and hence no Building Regulations (FOI response from OVEZ). Unless the science of lithium batteries changes, which is unlikely, within the terms of the development plan, it will be impossible to build an underground bus garage.

The developers say that this is only temporary because they hope (fingers crossed) that technology will advance to a point where it will be possible to deal expeditiously with fires in Lithium ion batteries.  TFL/ Ballymore building a huge underground space in the expectation  that the science of lithium batteries will change to allow new Building Regulations to be established, to demolish the existing bus garage and somehow to make provision for 190 buses for an unknown number of years, maybe  forever,  in an unknown place is  crazy because it will add to building cost for no benefit

Clearly the provision of a quality bus service at least to the present standard requires a full operational garage with suitable space and facilities for staff and management. This will have to be provided throughout any development programme. The existing bus garage with all facilities will be demolished early on in the build programme. 

6. Car Parking Reduction – Demise of Town Centre?

We appreciate that it is the GLA’s policy, as expressed in the London Plan, to discourage all car parking in centres with a high PTAL rating.  This policy though is something of a blunt instrument.  We can understand the justification in inner-city Town Centres, Hammersmith for example, or Golders Green, but Edgware adjoins the Green Belt so travel to many neighbouring centres is not well served by public transport, and this is why Barnet, as an outer-London Borough, has a higher percentage of car users than say an inner-London Borough.

Edgware Town Centre is served by The Broadwalk car park – 1035 parking spaces (plus about 200 spaces for staff, on the roof).  This is very well used by shoppers, commuters and visitors, plus ancillary functions such as parking for worshippers to the adjoining mosque).

Public parking 

The application reveals there will now in fact be 44 spaces for disabled visitors (which is less than the current 50 spaces) and just 248 public spaces (all located in the car park serving Sainsburys), leaving no parking at all for the 1,430 staff they say will be working in the replacement shops etc, nor shoppers other than Sainsbury customers, commuters, patients attending health facilities and all other Town Centre visitors – particularly the needs of visitors coming from areas with lower public transport accessibility, which is especially relevant given Edgware’s suburban context. Surely anyone can see this is plain unworkable?

Multi-storey car park is for disabled residents only

The development proposals quote 425 spaces in the proposed multi-storey car park (MCP), but the developers admit that priority must be given to new residents who are blue-badge holders – that require significantly larger parking spaces (and hence fewer in number) so if there is to be any surplus, the developers admit that this will be for their new residents only and so admittance to the MCP will not be available to shoppers, local residents, etc.

Given the likely chaos caused by the loss of other parking in Station Road (referred to above) especially when taking into account the years of construction works before any new shops can be built (if they ever are) we believe the effect of this development on the currently thriving Town Centre of Edgware will be catastrophic.  We feel it is likely that many of the businesses on Station Road will be forced to close and as more shops are shuttered, the reasons for visitors to come to Edgware decrease further, giving a vicious circle of decline to Edgware’s economy.

Car parking on surrounding roads

There is of course only limited parking around the environs of the site, but there is already a problem for local residents, with occupants of Premier House (who are technically not allowed to keep a car anyway) taking up some of this capacity. This problem can only get dramatically worse.

7. Deansbrook Nature Reserve (Site of Importance for Nature Conservation)

This land is sufficiently sensitive and important for the protection of various species, and the environment generally, that it is not open to the public.

Historically, when the Northern Line was extended to Edgware, the changes brought about involved realigning the stream and closing the old railway line so this land was not in use and not open to the public and hence left to nature effectively to recolonise for the last hundred years.  This has allowed protected species such as slow worms and bats (both of which have been registered with Green Spaces Information for Greater London as being present on this land) have been able to thrive undisturbed.

The importance of not disturbing this habitat has in fact been tested.   In 1997 the Secretary of State allowed the Appeal against Barnet’s deemed refusal to permit an access off Deans Lane with a condition imposed that the land be used “Only for the purpose of upgrading and maintaining the Northern Line Railway”.  It is implicit in the SoS’s decision that LUL recognise the environmental sensitivity of their proposed access route within a Site of Borough Importance of Nature Conservation – with protected slow worms and other reptiles and therefore it is implicit in the decision of the Inspector and SoS that the environmental sensitivity be respected and so by extension, to allow public access to this sensitive site would clearly be against this principle.

The developers of site 27 & 28 are now proposing that the Deansbrook Nature Reserve be open to the public as a walking and cycling route.  We can see 3 clear advantages to the developers should this be permitted.   Firstly, they can claim that an additional 5 hectares (approximately) of land now falls within their development site thus making their development densities drastically reduced in the number of habitable rooms per hectare proposed.   Secondly they can claim that they are providing at least some of the necessary green space that a development of this size should require in a location where otherwise it would be regarded as grossly deficient, and thirdly, they can claim strategic improvements to walking and cycling routes to support their claims for carrying out ‘improvements’ and ‘regeneration’.

In practice though, this is likely to have a highly detrimental effect to an area of very great environmental sensitivity and cause illegal disturbance to bats and slow worms.

The Ecology part of the Ballymore’s Environmental report indicates that 34% of the area of the woodland will be cleared.

The nature area has two ‘legs’ one out to Deans Lane and the other down to Deansbrook Road. The plan has a cycle path running along both. The pathway to Deans Lane will occupy pretty much the whole of the width of the green area. In other words much of this area will be cleared, leaving it, as of limited natural benefit.

The developers are seeking to get round the restrictions against the illegal disturbance of bats by offering to install a few bat-roosts.  Would this work?  We can just see the following scenario now:

Kid 1: (pointing) What’s that?

Kid 2: It’s a bat box.

Kid 1: Ooh I’ve never seen a bat, let’s throw stones at it to see if we can get it to come out.

Allowing the developers to build a paved bicycle slalom-run on the Nature Reserve will simply encourage children and young adults to play noisily on it, not to mention other unsavoury activities that might be encouraged by the semi-seclusion of the woodland.  Antisocial behaviour, drug taking and fly tipping are already issues in other local parks.  All of this is likely to make life a misery for the indigenous wildlife.  

Barnet council has the statutory duty of care for biodiversity under Section 40 of the Natural Environment and Rural Communities Act 2006. This legal mandate imposes upon public authorities the responsibility to conserve biodiversity, specifically safeguarding habitats of protected species like bats and slow worms. 

According to  NPPF, Paragraph 174: Conserving and Enhancing the Natural Environment

“Planning policies and decisions should contribute to and enhance the natural and local environment by: protecting and enhancing valued landscapes, sites of biodiversity or geological value and soils…”

The Deans Brook Nature Reserve, which is a Site of Importance for Nature Conservation (SINC), should be preserved and safeguarded. Development that threatens the habitat of protected species such as bats and slow worms directly contradicts this policy.

According to NPPF, Paragraph 179: Biodiversity

“To protect and enhance biodiversity and geodiversity, plans should… promote the conservation, restoration and enhancement of priority habitats, ecological networks and the protection and recovery of priority species…”

Building on the Deans Brook Nature Reserve contradicts this principle. The presence of protected species necessitates strict adherence to conservation laws, and the goal of a 10% net biodiversity gain further supports the case against development on this site.

In the Edgware SPD, objective 13 states protect existing and create new habitats that support diverse wildlife – how is this the case when protected Bats exist in that specific area, an area classified as a Site of Borough Importance for Nature Conservation. 

8. Loss of Shopping Centre

The Broadwalk is more than simply a collection of shops forming the economic heart of Edgware town Centre.  It is a secure, covered, heated space where people from many of the different communities that make up our town, go to socialise.  The developers admit that once they have demolished it, replacement shops and restaurants won’t be built for 4 or 5 years at the earliest.  We strongly believe that if the developers are permitted to go ahead with the destruction of The Broadwalk and its car park, many of the shops in Station Road will also go out of business and then the developers will be able to argue, when the time comes, that there is no point building further replacement shops since there are already so many shuttered unoccupied shops in Station Road.  The developers say in their Financial Appraisal that flats above shops are less valuable than in wholly residential buildings, so they have another incentive not to replace the shops they have demolished.  It should also be noted that the demolition of the shopping centre will also mean the loss of the only publicly accessible toilets in Edgware Town Centre.

9. Noise Nuisance and 13 years of construction disruption

Leaving aside the noise and pollution that the residents will need to endure during the estimated 13 years of construction, no respite is offered, even once the development works are complete.  The proposed underground bus garage was designed for electric buses, which of course produce no emissions, but instead would now be used by diesel buses which of course produce copious exhaust fumes and particulates.  Since the bus garage was not designed for this we have enquired as to how this basement will be ventilated for people to work safely down there.  The response was that all basements are required to provide ventilation in case of a fire and so that extractor equipment will be used.  Local residents living nearby surely wouldn’t object to the noise of powerful extractor fans being used in the event of an emergency, but having these fans running pretty much all day and all night…

In addition there is also the noise that would be made by the diesel generators brought in to charge the electric buses.

10. Water and drainage issues

Water usage should be calculated that on average a person will require 142 litres/ day.  

If in fact there will likely be 11,000 people living on site and this will require 142×11,000 =1,562,000 litres a day, and this is not including any restaurants or food outlets requiring water in the commercial part of the development.

The planning applications mention an estimated 3,350,000 litres per year estimate . This is out by a factor of 180!

Sewage requirements are calculated on the same basis as water, i.e 142 litres per person per day. The planning application suggests that the development will be fitted with some facility to recycle greywater ( any water not fouled such as bathwater) but this is optimistic and from other projects is lucky to take 30% of outflow, particularly as tall buildings have a small roof area (to harvest rainwater) in comparison with the number of dwellings.  The developers must explain where all this water supply will come from.  

Similarly, the sewage pipes will have to cope with between one million and one million and a half litres per day of outflow .  We have only found mention of one current foul sewer running from the Broadwalk toilet via the bus driver depot to Parkfield Crescent.  Two documents in the planning application both mention that Thames Water will be obligated to either strengthen the current sewer system starting at Parkfield Crescent or expand the network.

These figures place a great burden on Thames Water who have had 80 recent sewage leaks in Edgware to deal with, and are a company close to being bankrupt.  They will be obligated to deal with a similar amount of waste water where at present they only have one relatively small foul drainage system.  Thames Water reportedly have no idea as to how they can deal with the huge predicted increase in sewage flow.  We submit that until a realistic strategy can be evidenced on such an important detail, planning consent should not be granted.

11. Financial viability

In their submitted documentation, the developers tell us that the anticipated total revenue is £1.85bn but the scheme development cost will be “2.007bn so they anticipate losing £150m on the development.  Nonetheless (no doubt out of the goodness of their hearts) they plan to go ahead anyway.

Per-Lease!!

Do they think we are stupid?  They go on to say that if growth in values exceeds rising costs, then they could make a profit.  How realistic is that scenario at the moment?  The facts are that house prices in London have barely increased at all since the start of this decade and the price of flats has performed worse than that.  Over the same time-frame though, construction costs have increased massively (20% by some calculations), so perhaps there is something they are not telling us?

Even more scary is if we do actually accept what they are saying on viability.  If they are given permission to go ahead and commence their works as they plan – by demolishing the bus station and garage and the shopping centre, and then digging this enormous basement, – then what happens if their finances run out, and they go bust, as seems entirely possible given they admit they are embarking on a huge loss-making exercise?

The answer is that we would be left with a vast hole in the ground in the heart of Edgware that would be terrifyingly vulnerable to flooding given the slope of the land down Station Road.  Clearly no other developer would want to continue with this massively unprofitable scheme so who would be left to pick up the pieces?

12. The Labour Government has reduced Barnet’s housing requirement

The new Government is imposing a housing target on Barnet that is 29% lower than previously.  Surely this should be reflected in both the emerging Local Plan and any assessment of need for this proposed development.

13. Equality Impact

The proposals to demolish Edgware Bus station with the replacement of bus stops in the open will result in Direct Discrimination under the Equality Act 2010. Therefore Barnet Council should refuse planning permission for non compliance with the Equality Act, 2010. 
The proposals are dangerous due to the greater potential for traffic accidents and people with protected characteristics will be at greater risk.

The proposals are in non compliance with the Mayor  of London Transport strategy policies which covers equalities:  TfL have not conducted any meaningful consultation on the proposals  and hence have not complied with the Public Sector Equality Duty, Equality Act 2010. 

The solution is to maintain the present bus station and hence  to continue to have a well designed interchange.   In particular the 68 seats, enclosed and safe environment, staff being available for assistance, easy bus interchange within one location with clear access routes for wheelchairs and prams  is particularly helpful. .These facilities are especially necessary to the elderly, people with disabilities, frailties and mobility problems and also people with prams and children and young people that need a protective environment. 

The proposed replacement does not include similar facilities, therefore the planning application is in non compliance with  the Mayor  of London Transport strategy policies:  Figure 3.16 (Proposed development Bus Strategy Overview) shows a number of new bus stops that will replace the Bus station, but this is definitely not a bus station.  In many cases passengers will be required to cross Station Road to change buses or to change to / from Bus to Edgware Tube  Station, in some cases walking a significant distance, in the open.  This is to the severe detriment of passengers, particularly those with disabilities and having difficulty walking.. This is creating greater risk of traffic accidents, particularly people that are vulnerable including the elderly and people with children. 

There will be a heightened crime risk for passenger waiting for night buses by a  wet lonely bus stop compared with waiting in a safe, warm well lit bus station. 

Barnet Council and TFL have stated  that the transport interchange layout and facilities is a major asset.  The destruction of the bus station and the breaking up of an optimal layout means that there will no longer be a well designed interchange. This is against the Mayor of London Transport strategy. The strategy wants better interchanges not worse.

It should also be noted that there are presently 50 parking spaces reserved for disabled and/or people with a child in pram or buggy, but the proposals plan to reduce this number to 44. 

14. Lack of Green Space and Play Ground:

The development fails to meet environmental standards, lacking sufficient green space. This diminishes the quality of life for future residents and does not comply with London Plan requirements.  The developers are suggesting including the Deansbrook Nature Reserve to make up for some of the shortfall, but they should not be allowed to get away with this.

The 2021 Edgware Growth Area SPD accepts Edgware has a lack of open spaces. In 2009 a report showed Edgware had a deficit of open space (shaded pink).

“The provision of parks in the following Wards falls below the current borough average in terms of parks provision per 1,000 head of population:

… Edgware, …” (Parks and Open Spaces Our Strategy for Barnet 2016-26)

Based on Policy ECC04, “development proposals should make provision for open spaces, including parks and playing fields, where additional demand is created and new or improved open space is necessary, in accordance with the following standards:

  • Parks: 1.63ha per 1000 residents 
  • Natural Green Spaces: 2.05ha per 1000 residents 
  • Playing pitches: 0.75ha per 1000 residents. 
  • Play and informal recreation: as set out by London Plan Policy S4 Play and informal recreation which requires at least 10m2 per child of good quality accessible play provision. “

10,000 new residents will require the following green space within 400m of Broadwalk: 

  • Parks: 16.3 ha 
  • Natural Green Spaces: 20.5ha 
  • Playing pitches: 7.5ha 
  • Play and informal recreation: 1.54 hectares of good quality accessible play provision for children.

There is no Open Space of the above size within 400 metres of the Edgware Growth Area and the Deansbrook Nature Reserve, 1.9 hectares, cannot be used as there is no public access in order to preserve the habitat of protected species including the Bats and Slow Worms that have been found. 

In Edgware SPD, there is also a stipulation for inclusion of children’s playgrounds and facilities for older children such as football and basketball courts, outdoor spaces for leisure and recreation, which are not fulfilled in Ballymore’s plan. Rooftop gardens can not be classified as green spaces or outdoor spaces especially such as football pitch. 

15. Insufficient Public Transport Capacity:

The assumption that new residents will predominantly use public transport is flawed, as current services are already at capacity during peak hours, and this even without factoring in the planned influx of new residents, doubling the population of Edgware ward, or economic growth in the future.  No expansion of the bus or underground service has been planned for.

16. Overburdened Healthcare Services:

Local doctor’s surgeries are at capacity. The influx of 11,000 new residents will overwhelm existing healthcare facilities. They will need at least 5 full time GPs.  Currently Edgware GPs have lists of 2,400 rather than the recommended 1,800 and are already seriously overstretched.  The developers are offering to provide a building but merely providing a space for healthcare is insufficient as the deficiency is funding for additional healthcare facilities so the developers should also be required to provide funding for the ongoing healthcare of the incoming new residents for at least 10 years because funding by the NHS is calculated from the last census, so there will be a minimum 10 year time lag in providing new funding.  Stanmore and Colindale are finding this an insurmountable problem at the moment.

17. Education Shortage:

The plan does not address the need for new schools, worsening the existing shortage of school places.  The figures used in the application underestimate the number of children.  Children are 20% of the population.

18. Health Risks from Overcrowding:

High-density living conditions increase disease transmission risks and strain local healthcare services

19. Safety and Crime Concerns:

The plan fails to ensure a safe environment, with high-rise buildings posing risks for children and reducing community oversight especially to vulnerable families who will have no choice other than to accept the high-rise social housing flats they are offered. High-rise estates are associated with increased crime and antisocial behaviour, contradicting local policies.

20. Impact on Historic Buildings and Conservation Areas:

The proposed towers will overshadow Grade II Listed buildings like the Railway Hotel and St Margaret’s Church, violating national planning policies. The bulk and height of the buildings will detract from nearby Conservation Areas, such as Edgware High Street, Canons Park Estate, and Watling Estate.

21. Loss of Light and Privacy:

The development will result in significant loss of light and privacy for neighbouring residential areas. As detailed in the Environmental Statement, many properties in each of Station Road, Fairfield Crescent, Parkfield Close and Brook Avenue will have significant reductions in Daylight and sunlight amenity for much of each year. The newly built Premier Place will suffer the most extreme loss of light with both the blocks and the landscaped Amenity space being heavily overshadowed. The residents of Fairfield Crescent, Parkfield Close and Brook Avenue, whose suburban homes and gardens will be heavily affected will have had a reasonable expectation that they would be able to see daylight and sunlight, and  not have any changes to the area affect their properties amenity and ultimately financial value or saleability. Edgware is presently a suburban area and not a dense urban area with multiple high rise blocks, its residents have a reasonable expectation that their chosen lifestyle and rights will not be infringed.

There are large areas within the proposed development itself that will have low levels of natural light to the detriment of the future occupants. Significant proportions of the public areas designated as Podium Garden, North Road and South Road will be in shadow for most of the year, and many of the apartments in the tower blocks will receive little or no sunlight  or view of the sky.

22. Loss of commuter car-parking

The commuter car park has 275 spaces and is pretty much full every weekday.  The people who use it live in outlying towns and villages but work in London.  They obey the dictum that they should not drive all the way into Town, but should park in the facility provided and use public transport for the remainder of their journey.  If this development goes ahead, there will be no commuter car parking allowed.  What will these customers do then?  They will either be forced to give up their jobs, or to drive further into Town to seek a parking space where they may find it.  Burnt Oak?  Hendon?  Golders Green?  Either way this cannot be good for economic growth nor for a sustainable future.

23. Sustainability and Barnet’s Net-Zero Policy

Clearly, TfL are putting their land up for development for financial reasons, so the replacement of the bus garage and bus station is not even necessary, yet millions of tonnes of carbon are implicit in the current scheme with digging a 60,000 cubic metre hole in the ground which cannot even be used for its stated purpose. Above this would go 31 buildings including 25 towers up to 29 storeys high, with all the concrete and steel that would be required.  

We would contend also that to build all the replacement shops isn’t necessary either as the existing shopping centre works perfectly well.  And do we really need to replace the library (plus the much vaunted cinema is likely to prove unviable, after the 3 years rent-free – promised in the documentation – expires). So, all of this can hardly be considered a very sustainable development, friendly to the planet or in keeping with Barnet Council’s stated objective of Net Zero in this time-span.

24. Conclusion

In view of the timespan for objections, and the need to keep this document readable, we have not cited each relevant section of the application for each objection nor detailed all policy documents which the application violates, but we plan to make the rest of this detailed information available for Barnet planners before the 27th September. 

So, Edgware Town Centre is presently thriving.  Unlike many other medium and large Town Centres up and down the Country, there are very few vacant shops.  It is not, as the developers portray it, in desperate need of “Regeneration” and “Growth”.

Irrespective of how we have arrived at this point, the emerging Local Plan is working on the premise that almost 5,000 new dwellings need to built in Edgware Town Centre and that the right place for them are Sites 27 (The Broadwalk and its car park) and site 28 (Edgware Underground station with associated sidings and railway lines, Edgware bus station, garage and bus stands, and the Deansbrook Nature Reserve).

As we have argued above, it is inappropriate and unproductive to allow Site 28 to be redeveloped and the ambitions for Site 27 must be scaled down to a level in keeping with the character of Edgware.

The developers absolutely must not be given permission to demolish the bus station/garage until they have provided sufficient information for Barnet’s Highways and Transport departments to judge whether the replacement facilities will be in any way comparable to what would be lost.  Assuming common sense prevails, then Ballymore should be asked to go back to the drawing-board and come up with a scheme that is more in character with the town and friendly to the planet.  

The proposed development is clearly inappropriate and should be refused consent.  No doubt the developers are offering generous financial contributions if they can be allowed to build at these enormous densities, but the maxim is that planning consents may not be bought or sold.  No amount of money should be sufficient to make an unacceptable development acceptable.

To repeat: we are not against development but we don’t want to see Gross Overdevelopment.  Let the developers come up with a much more appropriate scale scheme that does not include the unnecessary demolition of the bus station/garage or The Broadwalk, but instead builds, for example, new mid-sized blocks, on columns, above the car park.