Edgware Community Association's Objections to Ballymore’s Application 24/2686/OUT

Part 4

To: Planning Officers, Barnet Council, Planning & Building Control, 2 Bristol Avenue, NW9 4EW

27 September

Dear Planning Officers,

The Edgware Community Association would like to formally object to Planning Application 24/2686/OUT and requests that Barnet Council refuse the application based on the following major concerns:

1 Building Trust Between People and Barnet Council 2

2 Impact Of Proposed Development on Daylight and Sunlight 4

3 Reduced Retail Space affecting viability of Edgware as a shopping centre 11

4 Significant Concerns About Proposed Fire Safety Strategy 12

5 Significant Lack of Amenity Space 16

6 Edgware Underground Station Will not Have Adequate Capacity 19

7 Existing Bus Station Offers Better Safety and Eases Interchange 20

8 Impact on Harrow Transport Networks and Public Spaces 22

9 Environmental, Climate Change, and Greenhouse Gases Objections 24

10 Incomplete Climate Change Strategy 26

11 Concerns about noise and vibrations during construction and operational use 27

12 Concerns CIL & S106 Calculations and benefit to the Edgware Community 28

13 Developer has repeatedly failed its committed to deliver social housing 31

14 Increased Crime at Edgware Underground Station 32

15 Objection Against Relocating Current Library 33

16 Inadequate Equality Impact Assessment and Violations of the Equality Act 2010 34

 1 Building Trust Between People and Barnet Council

In a low-trust society, rebuilding trust between people and local institutions like Barnet Council requires transparency, inclusivity, and meaningful engagement with the community. The council must focus on meaningful consultation, transparency in developer negotiations, and long-term planning that reflects public needs. By taking these steps, Barnet Council can restore public confidence and strengthen its role in serving the community.

Watch BBC London reporting of Edgware residents protesting against Ballymore’s high-rise plan for Edgware Sep 2023 

1.1 Meaningful Consultation

One major failing of councils is the lack of early and meaningful involvement of communities in the planning process. When residents feel there is no or inadequate consultation or believe that decisions are being made behind closed doors in favour of developers, trust is eroded. Engaging the public from the start of planning processes—such as local development plans—ensures their voices are heard. This goes beyond formal consultation and involves actively involving community groups in shaping the plans from the outset. The National Planning Policy Framework (NPPF) emphasises early community consultation, making it a key pillar for rebuilding trust between the council and its residents.

1.2 Transparency in Decision-Making

Another core issue in trust erosion is a lack of transparency in decision-making. When councils fail to disclose information about negotiations with developers, or keep pre-application discussions private, suspicions of favouritism and backdoor deals emerge. To rebuild trust, councils must make the decision-making process clear and accessible to the public. Ensuring these details are open to the public, possibly through Freedom of Information (FOI) requests, is critical for accountability and rebuilding public confidence.

1.3 Collaborative Design and Infrastructure Planning

Failure to incorporate community feedback, especially regarding the design of new developments, further deepens mistrust. When residents feel their input, in areas such as  scale, design, and environmental impact, is sidelined in favour of developer profits, division grows between the council and its constituents. Collaborative design, where the community plays an active role in shaping projects, demonstrates that Barnet Council values public input. The London Plan reinforces this by advocating for an inclusive approach to designing developments and infrastructure, which helps councils foster trust.

When developments fail to reflect local priorities, it signals that long-term community interests are being overlooked in favour of short-term development goals. Planning low- and medium-rise developments that are more adaptable to local needs shows a council’s responsiveness to community values, reinforcing public trust.

1.4 Fair and Transparent Financial Contributions

Councils must also ensure that financial negotiations with developers are conducted transparently. Section 106 agreements, which often involve subsidies or contributions to local infrastructure and affordable housing, are a key area where transparency is needed. If these negotiations are not open, there is a perception that developers are given preferential treatment, at the expense of public benefits like housing or community facilities. Ensuring that the public has access to these discussions and that outcomes align with community priorities helps restore trust in Barnet Council’s commitment to public welfare.

2 Impact Of Proposed Development on Daylight and Sunlight

This section is a formal objection to the planning application 24/2686/OUT in relation to impact on daylight and sunlight  both within  the proposed development and in relation to the surrounding area. This is based on the following material considerations: loss of light, overshadowing, effect on surrounding area, layout and density of building design. Also local, regional and national planning policies, specifically:

  • The London Plan Policy D4 “Housing quality and standards”
  • National Planning Policy Framework (‘NPPF’), 2021,2023

2.1 Summary

The development will result in significant loss of light and privacy for neighbouring residential areas. As detailed in the Environmental Statement, many properties in each of Station Road, Fairfield Crescent, Parkfield Close and Brook Avenue will have significant reductions in Daylight and sunlight amenity for much of the year. The newly built Premier Place will suffer the most extreme loss of light with both the blocks and the landscaped amenity space being heavily overshadowed. Reduced natural light levels impacts people’s physical and mental well-being, their perception of their properties and views.  No reference or assessment has been made to the ‘Right to Light’ that protects property owners of existing properties from loss of light as a result of subsequent developments on adjacent areas.

The Design & Access Statement shows that significant parts of the proposed development itself will have low levels of natural light, and many of the apartments in the tower blocks will receive little or no sunlight  or view of the sky  to the detriment of the future occupants. Significant proportions of the public areas designated as Podium Garden, North Road and South Road will be in shadow for most of the year, reducing their viability as additions to biodiversity, and their utility to residents.

2.2 Local, regional and national planning policies.

The London Plan Policy D4 “Housing quality and standards”  states that the design of developments should provide sufficient daylight and sunlight to new and surrounding housing that is appropriate for its context, whilst avoiding overheating, minimising overshadowing and maximising the usability of outside amenity space.

the National Planning Policy Framework (‘NPPF’), 2021 and 2023. Paragraph 130  “In applying paragraphs 129a and b above to existing urban areas, significant uplifts in the average density of residential development may be inappropriate if the resulting built form would be wholly out of character with the existing area”

2.3 Impact on existing properties around the development

The effect on the area surrounding the Development is contained in the Edgware Town Centre Environmental Statement. Daylight, Sunlight and Overshadowing is specifically addressed in Volume 3 Appendix: Daylight, Sunlight and Overshadowing (part 1-13). The results are also summarised in the Environmental Statement Non-Technical Summary.

The Environmental Statement Vol 3 Annex 1 – Planning Policy and Guidance states that “The results [of daylight and sunlight assessment] broadly indicate that retained levels of light are nonetheless commensurate or above those found to be appropriate for similar major schemes within an urban context, including other schemes in London”. The justification for this statement refers extensively to the Whitechapel Estate appeal decision in November 2018 (Ref: APP/E5900/W/17/3171437) as the basis to argue that alternative target values [for daylight and sunlight] have also been accepted as appropriate in assessing major development in dense urban environments, including in London.

This is not an applicable comparator or justification for the proposed density of housing for Edgware as:

  1. Edgware is a suburban area – with predominantly lower density development, predominantly residential, small building footprints and typically buildings of two to three storeys.
  2. Edgware is not  a “dense urban environment”, or an “inner urban environment”, or a “confined urban setting” referenced in the Planning Appeal APP/E5900/W/17/3171437.
  3. Whitechapel is a Central London location, adjacent to the City of London and its numerous existing very tall buildings, and of completely different characteristics to the outer edge of the London Borough of Barnet.

The proposed development does not meet the policy requirements detailed above .

The description of the analysis is detailed in Chapter 10: Daylight, Sunlight & Overshadowing

The impact is assessed using four parameters from BRE Guidance, namely, the Vertical Sky Component (VSC), the No-Sky Line Contour (NSL) and for sunlight, the APSH test calculates the percentage of probable hours of sunlight received by a window or room over the course of a year. There is also consideration of WPSH for sunlight received in the winter. Sun Hours on Ground Overshadowing (SHOG) shows how the shadowing from buildings affects its surroundings at the spring equinox.

BRE provides criteria for each of these parameters that represent the recommended minimum levels appropriate for ‘suburban settings’ which is specifically appropriate for the area surrounding the proposed development. The Environmental Statement repeatedly uses the argument that Edgware is a dense urban area, and that allows them to make an adverse effect grading system below the minimum proposed by the BRE (Report Tables 10.2 to 10.5). 

In each case loss of light compared to the current situation is considered ‘minor’ if between 20 and 30%. Moderate adverse if 30-40% and major adverse where more than 40%. Whilst the BRE recognises that slight deviation might be referred to as minor adverse impact, where the limit of acceptable light is 20% loss from the current situation, then it would be more than a minor adverse impact if one lost 30% of the light in any of the categories. This would be highly noticeable to the residents involved. The Table below shows the summary of all the data, NOT dismissing the category of ‘minor adverse’.

Parameter (Paragraph in report)

VSC (10.94)

APSH

NSL (10.95)

SHOG (10.807)

Total Analysed

2,736 windows in 176 properties

824 rooms 

1,465 rooms in 176 properties

96 amenity areas 

Meet minimum criteria (Negligible)

47%

97%

61%

79%

Not meeting BRE minimum criteria

53%

3%

39%

21%

Minor Adverse 20-30% loss of light

16%

Not specified

7%

Not specified

Moderate Adverse 30-40% loss of light

9%

5%

Major Adverse More than 40%

28%

27%

More than half (53%) of the windows in the 176 properties adjacent to the site will have less than the minimum expected daylight as measured by VSC, 39% of the rooms  will have less of the interior meeting the NSL criteria and  21% of properties will be heavily shadowed for at least 6 months of the year.Properties on Station Road including Premier House and Premier Place, and in Fairfield Crescent, Parkfield Close and Brook Avenue will have what is described as Moderate  or Major adverse reduction of daylight amenity. Properties  on Station Road specifically the newly built Premier Place and in Brook Avenue will have Moderate  or Major adverse reduction of sunlight amenity.  Properties  on Station Road and on Brook Avenue will have Moderate  or Major adverse Overshadowing. (Figures 1 and 2)

Figure 1. Shadowing effect within the development and on the Brook Ave area at 3pm on the 21st March

Figure 2.  Shadowing effect within the development and on Station Road area at 9am on the 21st March.

Figure 3. Shadowing within the development in December, March and June showing that many of the amenity areas are heavily shadowed throughout the year 

The   Environmental Statement  claims these are acceptable and expected impacts  for a new development in an urban context. We maintain that this is not the correct context for assessment of  impact in the suburban setting of Edgware, and that this specific aspect of the development plan does not meet the requirements in the London Plan or NPPF due to its excessive impact on the daylight and sunlight of the surrounding areas.

2.4 Impact within the development

The Design & Access Statement 8.2 Daylight & Sunlight analyses the impact on the proposed development itself in terms of VSC, NSL APSH.

Only general statements are provided about the daylight and sunlight being acceptable across the development. No detailed figures or analysis is provided. Low resolution images (Figures 295 to 298) provide more detail – the close proximity of many of the proposed tower blocks (for example 3.2 and 3.3; 3.4 and 1.4; or 3.7 and 3.8) means that even the South and Southeast facing sides of the second of each of these pairs of buildings would receive low levels of daylight having VSC levels of 15% or less. The N and NW aspects of most buildings will at least at lower levels receive low amounts of natural light and the set of buildings designated as Fairfield Terraces, (2.1 to 2.4) no natural light whatsoever according to Figure 297. This comes from the significant heights of the very tall buildings at the core of the proposed development

This is likely to have a significant negative effect on the health and wellbeing, both physical and mental of the residents of these parts of the development.

In terms of shadowing of amenity areas, the Design recognises that only half (10 out of 20) amenity areas will meet the very basic requirement of having 2 hours of sunlight on 21st March, Spring Equinox, when there is a total of 12 hours with sun above the horizon. This is illustrated in Figure 299 in the report (Presented without key and insufficient resolution to read the accompanying data and no source given.) 

Most of North Road and substantial parts of South Road would have less than 10 minutes of sunlight per day. The gardens proposed for the ‘podium’ area at the centre of the development are also heavily overshadowed by the surrounding towers and visually, less than half the area would receive even the minimum 2 hours of sunlight. (Figures 3, 4, 5).

Other analysis of Sunlight and shade is found in the Landscape Design & Access Statement. Section 8.2.2 Microclimate Analysis Figure 167 Sun Shade Analysis (reproduced here as Figure 5) shows that significant parts of the site are in shade at all times of the day across the year. Additionally, Figures 168 to 171, in Section 8.2.3 show quarterly seasonal maps of daylight distribution in the most high profile areas of the Site Station Square, Station Walk and Town Square. The majority of the open space gets less than 3 hours sunlight daily across the year, and only a small part of the area receives more than 4 hours sunshine, even in the Summer. This contradicts the assertion in Section 8.2.3 Daylight Analysis that “As can be seen in the diagrams, there is good daylight through the growing season of March to September across the majority of the public realm.”

This would indicate that, as designed, major parts of the development will be in shadow for at least 6 months of the year.

This would fail to meet the London Plan Policy D4 “Housing quality and standards”  states that the design of development should provide sufficient daylight and sunlight to new and surrounding housing that is appropriate for its context, whilst avoiding overheating, minimising overshadowing and maximising the usability of outside amenity space.

Figure 4.  Effects within the development – areas shown in blues and green have inadequate day or sunlight

Figure 5. Showing that many of the amenity areas are heavily shadowed

3 Reduced Retail Space affecting viability of Edgware as a shopping centre

The proposed retail and supermarket Gross Internal Area (GIA) in the new development is significantly reduced compared to the current offering, creating serious concerns about its adequacy in serving the community’s needs. Currently, the combined retail space of the Broadwalk Shopping Centre and the former Argos building amounts to approximately 24,200 sq. metres (22,667 sq. metres for Broadwalk and 1,570 sq. metres for Argos). However, the new development proposes only circa 18,600 sq. metres of retail and commercial space (7,336 sq. metres + 6,661 sq. metres + 4,631 sq. metres). This represents just 76% of the current retail space.

This significant decrease in retail provision contradicts the requirements for maintaining and enhancing town centre viability, as outlined in Policy SD6 of the London Plan 2021, which emphasises the need for development to protect and promote town centres as commercial hubs. Furthermore, the reduction could breach Local Plan Policies DM10 and DM11, which stipulate that new developments must retain sufficient commercial and community space to serve local needs.

Moreover, there is contradictory information across various planning documents regarding the provision of retail space, which creates doubt as to what retail area would be actually offered. Some of the planning documents state maximum space provision, but this will be at the discretion of the developer, who by their nature will maximise the residential dwellings with minimal retail/communal space to increase their profits. Such a scenario would contravene the National Planning Policy Framework (NPPF) Section 7, which mandates that developments contribute to strong, vibrant, and healthy communities by providing adequate services and amenities.

The proposed reduction in retail space, coupled with the lack of clarity in the planning documents, poses a significant risk to the long-term viability of the local economy and the community’s access to essential services. The plans appear misaligned with both local and national planning policies aimed at maintaining balanced, mixed-use developments.

Given the above and as a side-note, the current and the future reduced retail space means Edgware cannot and should not be classified as a Major Town. It fails to meet all the characteristics of a Major Town:

  • It does not provide borough-wide catchment
  • Its current and future retail space is well below 50,000 sq. metres
  • It has a low proportion of “comparison” goods relative to “convenience” goods – namely 10% vs 60%
  • It does not have significant employment, leisure, or civic function and with only 23% of floor space used for service industry

In summary Edgware is a suburban town and not a major town.

Source: Appendix A to TCFNA PBA MAPShttps://www.barnet.gov.uk/sites/default/files/lb_barnet_tcfna_report_-_final_-_vol_2_appendices_reduced.pdf

4 Significant Concerns About Proposed Fire Safety Strategy

The proposed fire strategy raises several concerns, particularly with respect to the underground EV bus garage. The reliance on ongoing research, incomplete fire suppression plans, and insufficient details on evacuation, fire resistance, and smoke control presents potential non-compliance with key fire safety regulations. Before final approval, these issues must be addressed through further testing, detailed planning, and compliance with established fire engineering standards.

4.1 Underground Electric Vehicle (EV) Bus Garage

EV Bus Fire Risk: While the design acknowledges potential fire risks, particularly high flame temperatures from EV bus fires, the fire protection strategy heavily relies on Promat-applied fire protection to withstand severe fire curves such as the RWS curve. The effectiveness of this approach is uncertain as fire tests for EV buses are still ongoing. The final proposed fire safety solutions depend on incomplete research, raising concerns about whether the proposed 4-hour fire protection is adequate for the unique risks of EV bus fires. This poses potential non-compliance with BS:7974 and BS:9999, which require thorough fire engineering principles.

London Fire Brigade (LFB) Concerns:

Through FOI request the London Fire Brigade stated firmly and comprehensively that the Ballymore’s underground EV bus garage proposal is  non viable as detailed below:  

The London Fire Brigade has assessed the proposal for an underground bus garage at Edgware requested by LB Tower Hamlets and came to the conclusion that it was not viable because of the impact of any fire caused by the lithium batteries in the electric buses catching fire. (FOI from London Fire Brigade about the scheme being non viable (Save Our Edgware & foi-response-foia79611-LFB-verdict-of-non-viable-Edgware-bus-garage, n.d.) and articles published on The Daily Telegraph and The Sun, Barnet Post and Times Series on the Edgware Bus Garage fire risks) (Telegraph – Electric bus station fire could turn high-rise homes into ‘volcano’, residents warn, 2023) (Sun & FIRE FEARS We’re terrified an EV charging hub will turn £1.7bn newbuild apartment blocks into a ‘VOLCANO’, n.d.) (London Fire Brigade Edgware EV bus garage safety warning, 2023) 

  1. The lack of established fire regulations for electric vehicle (EV) bus depots is a major issue for the proposed underground EV bus garage in Edgware. The fire strategy relies on ongoing testing and consultations with the London Fire Brigade (LFB) and TfL, rather than clear regulations specific to EV depots. This creates uncertainty and potential risks, as codified standards for EV fires may not be fully developed before construction starts.

Currently, there are no specific building regulations for underground garages housing electric buses. An FOI response from OVEZ confirmed that no such standards exist, and it’s unlikely they will be developed soon.

The unique dangers of lithium-ion battery fires, such as extreme heat and toxic fumes, make this reliance on incomplete research problematic. Without significant advancements in battery safety, it may be impossible to safely build an underground bus garage under the current plan.

  1. Fire Load and Mitigation: Parking 190 buses presents a high fire load. Although BS:7974 will guide the design, more detailed analysis, including physical fire testing and final design development, is necessary to assess if the proposed systems (compartmentation, fire barriers) are sufficient.
  2. Compartmentation: The proposal indicates a 120-minute fire-resistant barrier separating the garage from other areas, with potential for enhancement to 240 minutes. Given the risks posed by EV fires, a 240-minute fire barrier should be confirmed to comply with the requirements of Building Regulations Approved Document B, ensuring adequate compartmentation.
  3. Travel Distances and Smoke Control: The proposed travel distance for garage exits (45 metres to a protected stair or corridor) may exceed BS:9999 recommendations, especially in the context of EV fires where rapid evacuation could be critical. This distance must be carefully evaluated to ensure safe evacuation of staff and effective smoke control.

4.2 High-Rise Residential Buildings

  1. Evacuation Strategy: The document mentions that the “stay put” strategy will be used for residential buildings. While this is compliant with BS:9991, it could present risks if proper fire compartmentation fails or if evacuation lifts are not adequate. Concerns include:
  2. High-Rise Evacuation: Buildings taller than 18m will have two staircases and evacuation lifts, but reliance on a “stay put” strategy could be problematic if fire spreads beyond compartmentation, particularly in high-density buildings.
  3. Regulation Reference: The London Plan Policy D12 encourages a safer fire evacuation strategy with evacuation lifts and accessible egress for vulnerable occupants. It may be necessary to reconsider alternative evacuation measures, especially in buildings over 50m.

4.3 External Wall Systems

External Cladding and Fire Spread: The document confirms external walls will meet Class A2-s1, d0 or better standards. However, Block 2.7 (car park) shows use of “worse than Class A2-s1, d0” material. This poses a risk of vertical fire spread, violating Building Regulations Approved Document B requirements for fire safety of external walls, especially considering the car park’s potential fire load.

4.4 Fire Suppression and Detection Systems

Delayed Confirmation of Fire Suppression Systems: The fire suppression system, such as water mist or deluge, has not been fully defined and depends on further testing. This creates a gap in fire safety planning, as the systems must meet BS:7974 and BS:9999 requirements for complete fire engineering solutions. Suppression systems tailored specifically to EV fire risks must be confirmed before final approval.

Integration of Suppression Systems: The proposal suggests the potential use of water mist systems like FogTec, but details on how these systems will be integrated into the building infrastructure, particularly in terms of power requirements for long-duration fires, are missing. This raises concerns about compliance with fire suppression regulations, particularly for underground facilities.

4.5 Means of Escape

Bus Garage Evacuation Strategy: The plan assumes that the bus garage occupancy will not exceed 60 people, underestimating the potential risks during high-occupancy scenarios, such as maintenance shifts or emergencies. This could violate BS:9999 standards for exit width and travel distances, which must be recalculated for larger evacuation needs.

Accessibility Concerns: While evacuation lifts are planned for residential areas, the absence of equivalent provisions for the bus garage raises accessibility concerns for disabled staff. This is a potential violation of the Regulatory Reform (Fire Safety) Order 2005 and London Plan Policy D5, which mandate inclusivity in evacuation strategies for all occupants.

4.6 Firefighter Access

Firefighter Access to Bus Garage: While wet riser outlets along the perimeter corridor are mentioned, the strategy lacks details on how firefighters will operate effectively in the smoke-filled environment of an underground EV bus garage. Without comprehensive smoke control modelling, the efficacy of the proposed extract system is questionable. BS:9999 requires detailed strategies for effective firefighter access in such environments.

Pressurization and Egress Routes: Double-lobbied entrances every 45 metres are proposed, but details on the pressurisation system are vague. Compliance with BS EN 12101-6 (pressure differential systems for smoke control) needs clarification to ensure safe fire operations and compartmentation in the bus garage.

4.7 Structural Integrity and Fire Resistance

Structural Fire Protection: The strategy proposes a 4-hour fire resistance for the garage using Promat or similar materials. However, the reliance on calculation-based justifications is concerning, as real-world fire tests for EV fires are preferable for such critical infrastructure. Compliance with BS:9999 and BS:7974 must be verified through real-life testing rather than theoretical calculations.

Compartmentation: The bus garage is divided into five compartments, but the lack of detailed assurances regarding the fire shutters and barriers separating compartments raises concerns about potential smoke and fire spread. This could lead to a breach of Building Regulations Approved Document B, which requires effective compartmentation to prevent fire spread.

4.8 Internal Fire Spread

Fire Dampers and Cavity Barriers: The strategy mentions fire dampers and cavity barriers but provides insufficient details on the maintenance and inspection regime. Regular maintenance is crucial in such large-scale projects to ensure the proper functioning of fire dampers, as required under BS:9999.

4.9 Smoke Control and Extraction

Bus Garage Smoke Control: The mechanical smoke extract system proposed for the bus garage lacks detailed calculations and operational strategies. For an underground facility handling EV fires, rigorous smoke control modelling and real-time monitoring are essential to prevent hazards to adjacent areas. BS:7974 requires comprehensive smoke control solutions in fire-engineered buildings.

4.10 Technical Complexities and Future Proofing

Incomplete Data and Reserved Matters: The current fire strategy for specific elements like bus circulation, maintenance, and EV infrastructure remains under development. Approval of the current outline application without detailed strategies risks future issues if standards are not met during later phases.

5 Significant Lack of Amenity Space

The proposed development will severely lack adequate amenity space for the 10,900 residents it is designed to accommodate.

Excluding the Deans Brook Site of Nature Importance (SINC), which cannot be built upon, the total land available is just 7.9 hectares. With 5.5 hectares allocated for building footprints, only 2.4 hectares remain for roads, paths and amenity use. Low quality amenity space of 1.8 hectares is proposed to be provided in the roofspace, giving a total remaining land of 4.2 hectares.

The London Plan (Policy S4) stipulates 10 sqm per child, of which 1002 children are estimated according to the GLA calculator. Also the London Plan recommends 2 hectares of open space per 1,000 residents.

Category

Area (Hectares)

Notes

Total Site Area

10.3

 

Less Deans Brook 

2.4

 

Real Site Area

7.9

 

Less Building Footprint

5.5

 

Add Roof Space

1.8

 

Remaining Area for Amenity Space, Paths and Roads

4.2

 

Paths and Roads

1.185

Assumed 15% of real site area for paths and local roads

Total Available Amenity Space Area

3.255

Total available space including rooftop green space

Play Space Requirement

1.002

Based on 10 sqm per child, for 1002 children – The London Plan (Policy S4)

Amenity Space Requirement

21.8

2 hectares per 1000 people – The London Plan (Park/Play Space)

Total Available Space

3.255

 

Deficit in Amenity Space

19.547

 

This creates a significant shortfall of 19.5 hectares, which is well below the mandated requirement.

The above required area is far in excess of nearby parks in any case. For example Stonebridge Park has an area of 2.1 hectares, Watling Park has an area of 7.6 hectares and Chandos Park has an area of 6.5 hectares.

The NPPF emphasises the importance of access to high-quality open spaces and opportunities for sport and recreation, which can make an important contribution to the health and well-being of communities. “Access to high-quality open spaces and opportunities for sport and physical activity is important for the health and well-being of communities” (NPPF, paragraph 96).

The “Improving access to greenspace: A new review for 2020” by Public Health England highlights significant health benefits of access to greenspace, including improved mental health, reduced stress, and increased physical activity. Ensuring new residents in Edgware have access to greenspace can contribute to the overall health and well-being of the community. “Evidence shows that access to greenspace is associated with better health outcomes, including lower rates of mortality and morbidity” (p. 5).

Its vital that Barnet Policy regarding (Parks and Open Spaces Our Strategy for Barnet 2016-26) is adhered to. Edgware is deficient in open space, and hence the scale of the development needs to be downsized. 

While Community Infrastructure Levy (CIL) and Section 106 agreements allow for negotiations between the council and the developer to provide financial compensation, this approach fails to address the core issue of inadequate open space. The compensation may benefit infrastructure projects, but it does little to directly improve the living environment for the new residents, who will have minimal access to local parks or recreational areas. Existing residents will also suffer the consequences. As the population doubles in the area, they will experience overcrowding in the once peaceful amenity spaces they have long enjoyed. The added pressure on already scarce public spaces will deteriorate the quality of life for both current and future residents.

In this scenario, while the developer and council may benefit from financial agreements, the community as a whole stands to lose vital, livable open spaces. The well-being of all residents is at risk in exchange for short-term gains.

6 Edgware Underground Station Will not Have Adequate Capacity

There are significant concerns regarding Edgware Underground Station’s ability to handle the anticipated increase in passenger numbers resulting from the proposed development. The current infrastructure will require substantial upgrades to accommodate the projected demand.

The Transport Assessment Part 01 provides figures on expected travel flows generated by the development. Table 5-2: Residential Person Trip Rates estimates that during the peak morning period (8-9 am), each residential unit will generate 0.451 journeys. Furthermore, Table 5-9: Residential Work Mode Share indicates that 53.4% of these journeys will be made by rail, specifically via Edgware Underground Station.

Using these figures, the development will add approximately 820 new underground passengers departing Edgware LU station between 8-9 am, and a total of 1,800 additional passengers during the morning peak period:

  • 3,400 units x 0.451 journeys/unit/hour x 53.4% rail journeys = 820 additional passengers per hour

However, Table 5-55: Peak Hours Flow suggests that by 2038, without the development, there will be 1,709 passengers departing per hour in the morning peak. With the development, this number would purportedly increase by only 329 passengers per hour, implying that the total increase in station use would be less than 5% at peak times. This estimate is grossly insufficient, given the number of residents and anticipated demand from the development.

The analysis in Section 5.5.2.1: Edgware LU Station Analysis, which concludes that no significant upgrades will be necessary, is fundamentally flawed. The increase of 329 passengers per hour underestimates the impact on the station’s capacity and disregards the need for critical infrastructure improvements.

This violates London Plan Policy T3: Transport Capacity, Connectivity and Safeguarding, which requires that transport infrastructure is sufficient to meet future demand. The current assessment fails to account for the station’s existing constraints, including platform, stair, and entry capacity. Without substantial upgrades, Edgware Station will not be able to accommodate the increased passenger flow, violating key planning principles aimed at safeguarding public transport infrastructure and ensuring adequate capacity to support Good Growth (Policy GG2).

Furthermore, this also conflicts with Barnet Local Plan 2021, Policy GSS09: Existing and Major New Public Transport Infrastructure, which emphasises the need for high-quality transport improvements in growth areas. Paragraph 11.11.1 states: Major growth across Barnet provides opportunities to deliver high quality transport improvements in a planned and structured manner, and closely coordinated with other transport authorities, including adjacent boroughs.

The current proposal fails to deliver such improvements, undermining the objective of coordinating public transport infrastructure with significant residential growth. By not addressing the necessary upgrades to Edgware LU Station, the development risks exacerbating congestion, violating the Local Plan’s goal of integrating high-quality transport systems into growth areas.

Lastly, this failure to adequately consider transport infrastructure also raises concerns under National Planning Policy Framework (NPPF) Paragraph 108, which requires that transport networks can safely and efficiently accommodate development proposals. Without the necessary redesign and improvements to Edgware LU Station, the development jeopardises the sustainability and accessibility of the station and fails to support the broader objectives of the London Plan and the Barnet Local Plan.

7 Existing Bus Station Offers Better Safety and Eases Interchange

The already-established bus station next to the train station provides a superior environment for both safety and ease of interchange when compared to the proposed bus stands. The bus station is a communal, sheltered facility that not only enhances safety but also provides a seamless transport experience for passengers by centralising transport modes in one convenient location. The proposed bus stands, situated along Station Road, would create a fragmented and potentially hazardous environment for passengers, especially those transferring between bus and train services.

7.1 Safety

  • Bus Station: The current bus station offers a well-controlled, dedicated environment for passengers, which significantly reduces the risk of accidents. With sheltered waiting areas and clear, organised signage, passengers are fully protected from surrounding road traffic. This is especially important during peak hours when the volume of vehicles and pedestrians is high.
  • Bus Stands: Bus stands located along busy roads expose passengers to moving traffic, increasing the risk of accidents, particularly for vulnerable groups such as children, the elderly, and the disabled. Waiting for buses on a roadside creates a less secure environment, heightening the potential for injury. Additionally waiting passengers, especially women, will feel more vulnerable at night.

 7.2 Interchange Needs

  • Bus Station: The existing bus station is conveniently adjacent to the Edgware train station, allowing for efficient, hassle-free transfers between buses and bus/train services. This integrated setup encourages greater use of public transport by reducing the inconvenience of switching between modes, especially for passengers with limited mobility.
  • Bus Stands: In contrast, the proposed bus stands would be farther away from the train station, making transfers less convenient. The additional distance, combined with potential exposure to poor weather or unsafe walking conditions, could discourage people—particularly the elderly or disabled—from utilising the service, thereby reducing the overall efficiency of the transport system.

7.3 Congestion

  • Bus Station: The existing centralised bus station provides an organised framework for bus arrivals and departures, helping to manage traffic flow more effectively. By confining buses to a dedicated space, street congestion around Station Road is minimised, even during busy periods.
  • Bus Stands: The introduction of multiple bus stands scattered along Station Road could worsen traffic congestion as buses pull in and out, particularly during rush hour. The potential for bottlenecks and delays would likely rise, causing inconvenience to both passengers and other road users.

 7.4 Passenger Experience

  • Bus Station: The bus station offers a warm, sheltered space with amenities such as seating, information desks, and real-time travel updates. Passengers benefit from a comfortable environment where they can access multiple bus services from a single, well-organised location. This improves the overall experience and encourages greater public transport use.
  • Bus Stands: A series of bus stands would result in a less comfortable experience, especially in bad weather. Without the protection of a centralised shelter, passengers are left exposed to the elements.

7.5 Flexibility and Capacity

  • Bus Station: The existing bus station is designed to accommodate high volumes of buses and passengers, making it ideal for handling peak travel times. Its layout allows for efficient scheduling, improving the management of services and minimising delays. This flexibility makes it better suited to meet the growing passenger volumes of nearby developments.
  • Bus Stands: Bus stands have limited capacity, which could lead to operational challenges when several buses arrive at once. The lack of dedicated infrastructure for managing multiple buses could result in overcrowding and scheduling conflicts.

7.6 Lack of Local Consultation

As has been stated before, there has been a lack of meaningful consultation by both Barnet Council and the developer. This also applies to the transport services as well, where no-one has consulted locals of what facility they would prefer: a bus station which works or bus stands spread on Station Road. Doing paper modelling is no substitute for asking users what facility they would like!

8 Impact on Harrow Transport Networks and Public Spaces

The traffic and environmental impacts on Harrow’s transport networks, residential areas, and public spaces have not been adequately considered in the development’s current plans. This raises concerns about the long-term sustainability and liveability for both the future residents of the development and the existing residents of Harrow.

The proposed development has failed to adequately consider the impact it will have on neighbouring Harrow’s transport infrastructure and public spaces. Specifically, the increase in traffic around Canons and Stanmore Station (Jubilee Line) due to the limited future parking provisions in Edgware, coupled with the disruptions caused by construction activities, has not been sufficiently addressed in the transport assessment. These areas already experience high commuter traffic, and additional pressure from displaced vehicles could exacerbate congestion on these critical transport links.

Moreover, there is the potential for secondary parking pressures to spill over into Harrow’s residential areas, particularly affecting Canons and Edgware wards. This secondary parking would likely result in increased congestion on already busy roads in Harrow, further impacting the daily life of residents. The assessment has not adequately factored in this spillover effect, which could also result in heightened use of residential streets for parking, leading to further traffic and safety concerns.

An additional concern is that many neighbouring areas in Harrow have a Public Transport Accessibility Level (PTAL) that is notably lower than that of Edgware. The PTAL rating measures how accessible public transport services are in a given area, and parts of Harrow, particularly around Canons Park and Stanmore, have significantly lower PTAL ratings. This means that many residents in Harrow are already more reliant on private vehicles due to limited public transport options. The development’s limited parking provisions in Edgware will likely exacerbate this issue, as displaced drivers turn to Harrow for parking, where public transport services cannot adequately absorb the additional demand. This would not only lead to greater congestion but also undermine the accessibility of transport services for Harrow residents, further straining the area’s limited infrastructure.

In terms of public spaces, the proximity of popular green spaces like Chandos Recreation Ground, Lake Grove Park, and Canons Park, which are all within easy reach of the development site, has not been sufficiently considered in terms of potential additional demand. These parks already experience high footfall, and the influx of new residents and visitors may create a localised deficit of open space, impacting the quality of life for existing Harrow residents who rely on these areas for recreation and leisure. The strain on these public spaces could reduce the accessibility and enjoyment of these essential community assets, leading to a degradation of both environmental quality and social well-being in the area.

9 Environmental, Climate Change, and Greenhouse Gases Objections

The developer’s claims of environmental benefits are overly optimistic and fail to consider the long-term impact of the development. Barnet Council must carefully scrutinise the environmental implications of this development. The benefits presented by the developers are either short-lived or insufficient to counterbalance the negative environmental impacts. A more realistic and sustainable approach would involve favouring low- to medium-rise developments that integrate better with the environment, reduce resource consumption, and minimise disruption to local ecosystems and infrastructure.

9.1 Developer’s Claims and Their Shortcomings

  1. Temporary Environmental Benefit Due to No Car Movement: The developer argues that the lack of car movement in the car park during construction will lead to a reduction in CO2 emissions. While this temporary reduction may offer some short-term environmental benefit, it fails to account for the long-term impact once the project is completed.
  2. Tree Replacement and Roof Garden:  The developer claims that replacing the existing 188 trees with new ones, along with the inclusion of a roof garden, will result in a net environmental benefit. However, mature trees provide a critical environment; the loss of green space is highly questionable, as such features often fail to replicate the ecological value of established ground-level greenery. Replacing them with younger saplings will take decades to match the benefits provided by mature trees. Moreover, the suggestion that a roof garden will adequately compensate for areas such as carbon sequestration and supporting biodiversity is far-fetched. 
  3. Grey Water Recycling: While the implementation of grey water recycling is a positive step, it is insufficient to offset the wider environmental impacts of the large-scale development. The additional strain on local water resources and infrastructure due to the influx of new residents remains a significant concern.
  4. Reduced Car Parking and Environmental Benefits: The developer suggests that limiting parking spaces will promote more walking, cycling, and public transport use, contributing to environmental benefits. However, this assumption is flawed. The reduction in parking may instead result in spillover into surrounding areas, worsening congestion and creating safety hazards, as seen with the Premier Place development. Additionally, many residents may still rely on cars, buses, or taxis for practical reasons, such as grocery shopping or commuting, which contradicts the developer’s optimistic claims about reduced car use.

9.2 Increased Traffic and Air Quality Concerns

The developers appear to have overlooked the increased traffic from delivery vehicles serving the new residential and commercial units, as well as the rise in bus and taxi traffic from new residents and visitors. This will likely lead to further congestion and negatively impact air quality in the area, undermining any environmental benefits from reduced private car use.

9.3 Environmental Impacts of High-Rise Developments

  1. Resource Consumption: High-rise developments typically require more resources with high embodied energy, resulting in greater greenhouse gas emissions during construction. In contrast, low- and medium-rise developments are less resource-intensive, generating lower emissions and leaving a smaller carbon footprint.
  2. Land Disturbance and Construction Waste: High-rise buildings often involve significant land alteration and generate large amounts of construction waste. This leads to higher emissions, especially from landfill disposal. Lower-rise developments disturb less land, produce less waste, and are easier to integrate into existing environments.
  3. Energy Efficiency and Operation: High-rise buildings demand more energy for heating, cooling, and ventilation, leading to increased greenhouse gas emissions. In comparison, low- and medium-rise buildings are typically more energy-efficient and adaptable to sustainable energy solutions, such as passive design features.
  4. Urban Heat Island Effect: High-rise buildings contribute to the urban heat island effect, exacerbating local temperature increases and energy demands for cooling. Lower-rise developments, by contrast, incorporate more green spaces, which can mitigate the heat island effect and enhance carbon sequestration.
  5. Climate Resilience: High-rise buildings are less resilient to climate change impacts such as heatwaves and extreme weather due to their reliance on energy-intensive systems. Low- and medium-rise developments are generally more adaptable, with passive design elements and green spaces that contribute to greater resilience.

9.4 Lack of Infrastructure and Transportation Support

High-rise developments necessitate significant infrastructure upgrades, which increase greenhouse gas emissions. The Northern Line, already under strain from other local developments, is unlikely to be able to handle the additional passenger load effectively. Low- and medium-rise developments would integrate more easily with existing infrastructure and have a lower overall environmental impact.

10 Incomplete Climate Change Strategy

The current climate strategy for the proposed development lacks essential details in areas such as carbon reduction targets, emissions during construction, and long-term climate adaptation. To meet national and local climate regulations, the proposal must commit more clearly to net-zero carbon goals, enhance flood resilience, and adopt a robust circular economy approach.

10.1 Energy Use and Carbon Emissions

  1. Carbon Reduction Targets: While the development aims for a fossil fuel-free future and adherence to sustainability standards like BREEAM, it lacks a specific plan to meet the UK’s legally binding net-zero carbon targets by 2050 and the London Plan Policy SI2, which requires major developments to be net-zero carbon. There are no firm strategies for reducing operational carbon emissions or achieving substantial carbon savings during construction.
  2. Regulatory Compliance: The London Plan mandates a 35% reduction in on-site carbon emissions, with any shortfall addressed through carbon offsetting or additional on-site measures. The strategy relies on general statements about future low-energy use without offering specific data or commitments on how these reductions will be met across all phases.

10.2 Impact on Climate Resilience

The proposal discusses climate resilience but lacks concrete commitments. Extreme weather events, including flooding and heatwaves, are likely to increase. While the IEMA Environmental Impact Assessment Guide suggests design features to mitigate these risks, the proposal does not sufficiently address how the development will be protected against London’s projected climate impacts, particularly regarding temperature increases and flood risks.

  1. Flooding and Drainage: The development includes a Flood Risk Assessment and aims to manage surface water via sustainable drainage systems (SuDS). However, it falls short in addressing the impact of climate change on long-term flood risk, particularly the management of increased rainfall events. The strategy does not adequately comply with the Flood and Water Management Act 2010 or London Plan Policy SI13 on sustainable drainage.
  2. Overheating and Heat Resilience: The strategy provides little detail on how the development will adapt to higher temperatures, heatwaves, or the urban heat island effect. Building Regulations require developers to consider overheating in residential units, but the proposal lacks detailed measures such as passive cooling, green infrastructure, or high-performance materials for climate adaptation.

10.3 Minimising Greenhouse Gas Emissions and Mitigation

The 13-year demolition and construction phases are expected to generate significant greenhouse gas emissions. While mitigation measures like low-carbon materials, renewable energy, and electric vehicle infrastructure are mentioned, there is no detailed plan on how these will be integrated. The development must align more closely with the National Planning Policy Framework (NPPF), which emphasises energy efficiency and carbon reduction in design, construction, and operation. The lack of a clear renewable energy plan or carbon offsetting strategy could result in non-compliance with the NPPF’s climate change adaptation and mitigation policies.

The application does not provide clear evidence of meeting the zero-carbon target required by London Plan Policy SI2, which mandates a 35% reduction in CO2 emissions. While emissions reduction measures are mentioned, there is insufficient detail on how these will meet the standard. Additionally, there is no clarity on whether any shortfall will be addressed through carbon offsetting or other means, as required by policy.

10.4 Circular Economy and Waste Management

Although the proposal mentions a commitment to the circular economy, it lacks specifics on minimising construction waste and reusing or recycling materials. London Plan Policy SI7 emphasises waste reduction and resource efficiency, but the strategy needs clearer details on construction waste volume, prioritisation of recycled materials, and whether a Circular Economy Statement will be included in the planning process.

11 Concerns about noise and vibrations during construction and operational use

There are concerns about the high level noise and vibration from both the construction and operational phases. These include impacts from road traffic, building services, and re-radiated noise from trains. There is significant impact expected on nearby sensitive receptors, such as Edgware Primary School and residential areas. 

11.1 During Demolition and Construction

Significant noise and vibration effects will be experienced during demolition and construction particularly residential areas (R1-R8) and (Edgware Primary School). Construction activities such as piling, excavation, and the use of heavy machinery will cause both noise pollution and vibration impacts, which will disturb nearby residents and businesses.

Construction traffic noise will affect residents and schools, with an anticipated increase in road traffic from heavy goods vehicles (HGVs). Residents near road link 5 (Church Way) will be significantly impacted leading to a potential deterioration in air quality and disturbance.

11.2 Traffic Noise Post Construction

The redistribution of road traffic, particularly on Church Way and Approach Road, will significantly increase noise levels post-construction. This is especially concerning for residences close to the relocated bus garage and roads leading to it.

Noise impacts from road traffic around Station Road and the bus garage relocation are key operational concerns. The continuous noise from vehicle movements, especially if diesel buses are used, raises concerns about air and noise pollution. The noise from the bus depot and commercial activities will impact nearby residents and could lead to significant long-term noise disturbances

11.3 Noise from Building Services and Commercial Units

Building services equipment (e.g., HVAC, fans) will create noise that affects nearby sensitive receptors. Commercial units will generate additional noise during their operation, particularly from deliveries, which can disturb nearby residences, especially if deliveries occur at night. Without proper noise control measures, the nearby receptors could be disturbed by continuous equipment noise.

11.4 Re-radiated Noise from Railways

Apartments within 20 metres of the railway will experience re-radiated noise from trains passing by, particularly affecting apartments in Development Plot B. Noise levels in some apartments will exceed 35 dB LASmax, which is higher than the recommended limits for internal noise. Private balconies and outdoor areas near busy roads and railways may not comply with BS 8233 noise standards, making these spaces less enjoyable for residents.

11.5 Concerns on Health and Quality of Life

The cumulative impact of ongoing construction and future developments is going to be very detrimental, especially in terms of increased noise from construction activities across multiple phases of the development. Noise may significantly affect health and quality of life, leading some individuals to make representations to courts, for noise nuisances, under The Environmental Protection Act (EPA) 1990 (Section 82).

12 Concerns CIL & S106 Calculations and benefit to the Edgware Community

The current approach to CIL and S106 levies allocation raises serious questions about whether Edgware will benefit from these payments. The demolition of existing community infrastructure without the availability of the new infrastructure for years, the reliance on public subsidies for affordable housing, and the borough-wide allocation of CIL and S106 funds all point to a scenario where the local community bears the costs of development without reaping proportionate rewards.

Barnet Council should guarantee that CIL and S106 levies are directly reinvested in Edgware to mitigate the significant community disruption and loss of services.

12.1 Accuracy Concerns About CIL & S106 Values 

The proposal presents a total value of circa £63 million for the CIL and S106 levies, without explaining how it was derived or the amount of relief obtained.

We have calculated these levies using Barnets, Mayor of London and BCIS guidelines and arrived at the figure which is almost 100% more than that in the submitted plan; circa £122 million against circa £63 million!

 

Calculated

In Proposal 

Mayoral CIL

£             18,614,374.70

£      18,910,783.00

Barnet CIL

£          125,510,019.39

£      39,608,241.00

S106

£            4,354,000.00

£         4,354,000.00

Relief

-£        26,354,412.65

 

Net Levies

£          122,123,981.44

£      62,873,024.00

12.2 Demolition of Existing Community Infrastructure

Barnet Council allows developers to provide infrastructure as part of the CIL obligations, either wholly or partially, to support the infrastructure needs of the new development. The developer proposes a new library, community hub, and electric-enabled transport interchange, valued at around £137 million (and with the levies above are claiming to provide £200 million of benefit to the community). However, this proposal is ironic as the developer is demolishing existing functional community assets, including:

  •    A fully operational library.
  •    A community hub (Broadwalk Shopping Mall).
  •    A bus station.

Hence the developer is not providing any value to Edgware since we already have these community facilities, and does not gain anything from the £137 million being spent! These facilities are vital to the Edgware community and their demolition creates a gap in services that will persist for years before any new infrastructure is delivered.

Moreover, the proposed electric-enabled transport interchange is delayed pending the establishment of fire safety standards for electric vehicle (EV) bus storage in underground facilities. This renders the proposed transport solution uncertain, further exacerbating the community’s loss of essential services.

12.3 Concerns About Affordable Housing Provision

Under  the Town and Country Planning Act 1990, developers are required to provide affordable housing, either on-site or through financial contributions. In this case, the developer has sought a subsidy from both Barnet Council and the Greater London Authority (GLA) for affordable housing construction. It is anticipated that the GLA will provide a 100% subsidy, as they have done this often in the past.

   This situation raises two key concerns:

  • No developer contribution to affordable housing: Despite the obligation, the developer is relying on external public subsidies, meaning it will not bear the financial burden of delivering affordable housing. This undermines the intent of S106 agreements, which are designed to ensure developers contribute their fair share to affordable housing.
  • CIL reduction through affordable housing provision: The developer is using the provision of affordable housing as justification to reduce their CIL payments, although it bears no cost for its construction. This loophole allows the developer to avoid a significant portion of its financial obligations to the community.

12.4 CIL Phasing and Delayed Payments

The developer’s proposal to phase CIL payments raises further concerns. Payments are not expected until after the second phase of development, while the first phase—comprising site preparation, remediation, and demolition—is considered non-chargeable under the CIL regulations.

Regulation 8 of the CIL Regulations 2010 allows for phased payments, but there is no provision that exempts site preparation and demolition from CIL if these activities are part of the development that ultimately benefits from infrastructure improvements funded by the levy. The community will lose essential services, such as car parking, the Broadwalk Centre retail outlets, and the bus station, for an extended period during these initial phases. The loss of these community facilities without compensatory CIL charges in the first phase places an undue burden on Edgware residents.

It is recommended that CIL charges should apply during all phases of the project, particularly given the significant community disruption caused by the demolition of critical infrastructure.

12.5 Uncertain Benefits For Edgware from CIL Contributions

The estimated £60 million in CIL contributions from this project is expected to fund borough-wide and London-wide infrastructure improvements. However, there is no guarantee that Edgware will benefit from these funds, despite being the area most affected by the high-density development.

Regulation 59 of the CIL Regulations 2010 stipulates that CIL funds can be spent on infrastructure across the borough, but this flexibility often leaves specific areas like Edgware without tangible benefits, even though they bear the brunt of development impacts. The lack of amenity space, coupled with the high-density nature of the proposed development, means that current and future Edgware residents may not see improvements to local infrastructure, parks, or community facilities.

It is recommended that Barnet guarantees that all the charged CIL  levy is used for Edgware, and is transparent in sharing this information. We urge that the detailed CIL agreement be made publicly available before any decision is reached by the Development Management Committee. This agreement must be scrutinised thoroughly to ensure the proposed infrastructure improvements are adequate and timely.

12.6 No Guarantee of S106 Contributions Benefiting Edgware

Similar concerns arise with the £4.35 million in S106 contributions, which are intended to support local health and education services. Given Barnet’s discretion to allocate these funds to borough-wide initiatives, there is no assurance that Edgware’s local health services, schools, or community amenities will benefit directly from this contribution.

It is recommended that Barnet Council should provide explicit guarantees that all of the S106 funds will be earmarked for improvements to health, education, and community services in Edgware. This would ensure that the local community, which will be disproportionately affected by the development, sees tangible benefits from the developer’s obligations.

13 Developer has repeatedly failed its committed to deliver social housing

Ballymore has a history of failing to deliver the required affordable housing units in previous developments, despite receiving significant subsidies. This pattern of non-compliance with regulations such as London Plan Policy 3.2 and Barnet Local Plan raises serious concerns about their ability to fulfil their commitments for Broadwalk Edgware. The developer’s recent request for additional subsidies and proposal for a financially unviable development suggest that they may repeat this behaviour in the current project.

To illustrate our concerns here are some examples of the many development projects where Ballymore has failed to keep its promise and in contradiction to policy.

Development

Affordable Housing Promised

Affordable Housing Delivered

Level of Subsidy

Current Status

London City Island, Canning Town

35%

Circa 15%

20%

2014-2018

Royal Wharf, Royal Docks, London

35%

Circa 20%

15-20%

Started in 2014, Ongoing

New Festival Quarter, Canning Town

35%

Circa 30%

10-15%

Started 2016, Completed

Timber Yard, Southwark, London

35%

20-25%

10-15%

Started in 2018, Ongoing

Crossrail Place

35%

18%

5-10%

2012-2015

Orchard Place

35%

25%

10%

Started in 2020, Ongoing

 The significantly reduced level of affordable housing likely to be provided will exacerbate the housing crisis in Barnet and fail to address the council’s backlog.

14 Increased Crime at Edgware Underground Station

Based on statistics released by the British Transport Police, Edgware Underground Station has the highest crime rate among all neighbouring stations on both the Northern Line and the Jubilee Line. Crime rates at Edgware are over 325% higher than at nearby Burnt Oak and Colindale stations. In comparison to Canons Park on the Jubilee Line, the crime rate at Edgware is 640% higher.

Station

Annual Crime Rate 2023-2024

Annual # Passengers

Crime Rate/ 100,000 Passengers

Edgware

45

2,594,419

1.73

Burnt Oak

12

2,259,986

0.53

Colindale

15

3,113,639

0.48

Canons Park

4

1,462,742

0.27

With plans to double the population of central Edgware by adding 10,900 residents, along with office workers and construction personnel, the crime rate is likely to increase further. An influx of people in such a concentrated area will inevitably lead to more criminal activity in and around the station, with potential spillover into Edgware Town Centre and nearby residential areas.

While CCTV cameras may be installed, they are primarily used for post-incident investigations rather than effectively preventing crimes from occurring. Increased footfall in an already high-crime zone could make Edgware even more vulnerable to issues such as violence, sexual crime, antisocial behaviour, theft, and vandalism. The projected population surge poses a serious risk to the safety and security of local residents, commuters, and businesses.

15 Objection Against Relocating Current Library

We strongly object to the proposed relocation of Edgware Town’s beloved and well-used public library into the developer’s new estate. This library is not just a building; it is a vital community hub that has served local residents for years, offering a quiet, welcoming space for reading, learning, and socialising. Its displacement will have serious and far-reaching negative impacts on our community, which relies on it daily.

The proposed new location, within a dense estate of 10,900 residents, including around 500 students, is deeply concerning. With many students now studying remotely, we fear the library will be completely overrun and overwhelmed by this sudden influx. This will swamp the facility, making it much harder for local residents to access the resources they depend on. The library, which should be a sanctuary for our community, risks becoming an overcrowded, chaotic space that fails to meet the needs of both the long-standing residents and the new influx of students.

Furthermore, the proposed library simply will not have the capacity to serve such a significantly expanded population. With the number of residents increasing and students using the library for extended periods, this lack of adequate space and resources will lead to overcrowding, frustration, and a marked decline in service quality. The unique needs of our diverse community, which includes families, elderly residents, and children, will be sidelined by this poorly planned relocation.

To make matters worse, the developer’s claim that this relocation offers “community benefits” is misleading and disingenuous. This is not an additional community facility, but merely the relocation of an existing one. There is no new service being provided to the community, only a reshuffling that risks losing the heart of what makes Edgware’s library so special. Presenting this move as an enhancement is an attempt to inflate the perception of community benefits when, in reality, we are being short-changed.

We urge the Council to see through this hollow claim and recognize that this proposal does nothing to enhance the local infrastructure. On the contrary, it threatens to take away a cherished public service from its rightful place at the heart of Edgware, only to replace it with a crowded, under-resourced alternative that serves neither the current residents nor the future ones adequately. We call on the Council to reject this ill-conceived plan and preserve our community’s library in its current, accessible, and well-functioning location.

16 Inadequate Equality Impact Assessment and Violations of the Equality Act 2010

The Equality Impact Assessment (EIA) conducted for the Ballymore Edgware Town Centre development presents multiple flaws and potential violations of both regulatory standards and the Equality Act 2010. These key issues demonstrate that the EIA does not adequately fulfill its role in safeguarding the needs of people with protected characteristics, as mandated by UK law. Below are the primary shortcomings and associated violations:

  1. Failure to Meet Public Sector Equality Duty (PSED) Under the Equality Act 2010:
    The Equality Act 2010 places a legal duty on public authorities to eliminate discrimination, advance equality of opportunity, and foster good relations among those with protected characteristics. The EIA fails in this regard by:
    • Neglecting to address disproportionate impacts: Critical issues such as reduced parking affecting elderly, disabled individuals, and parents with young children are inadequately analysed. Additionally, the removal of the covered bus station, which provides shelter and safety for vulnerable groups, is a key omission.
    • Inadequate engagement with local religious communities: Despite a significant Muslim (15%) and Hindu (8%) presence in the area, the EIA does not show meaningful consultation with these communities, particularly in relation to access to religious spaces, parking, and potential impacts on worshippers.
    • Ignoring impacts on Jewish communities: The EIA fails to recognize the importance of Edgware as a hub for Jewish communities, particularly concerning kosher shops and religious facilities, despite highlighting that 17% of the local population is Jewish.
  2. Inadequate Consultation and Engagement Process:
    The assessment does not reflect adequate engagement with the local population, particularly those with protected characteristics, such as the neurodivergent and disabled communities. Local organisations like Kisharon Langdon, which supports individuals with learning disabilities, were not consulted, despite being located near the development. This violates the PSED’s requirement to foster good relations and ensure that the voices of vulnerable groups are heard and considered.
  3. Non-Compliance with Inclusive Design Standards (BS 8300):
    The development fails to meet BS 8300-1:2018, a national standard that requires accessible parking spaces to be within 50 meters of an accessible entrance. The proposed residential blue badge parking is located approximately 400 meters away from the furthest residential block, making it non-compliant with accessibility regulations. This will disproportionately affect individuals with mobility impairments, elderly people, and disabled residents.
  4. Fire Safety and Evacuation Violations (BS 9991):
    The EIA does not adequately detail fire safety and evacuation measures for disabled individuals. BS 9991:2015 requires detailed planning for the safe evacuation of all building occupants, including those with disabilities. The lack of clarity around emergency routes and refuge areas raises serious concerns regarding compliance with fire safety regulations for non-residential and residential buildings.
  5. Inadequate Consideration of Neurodiversity and Learning Disabilities:
    The EIA fails to recognize the needs of neurodivergent individuals, despite the presence of facilities like Langdon College and Oakbridge Special Education near the development. This omission reflects a broader failure to incorporate PAS 6463:2022 guidance for neurodiversity in the built environment, which is critical for ensuring inclusive and accessible design for all.
  6. Impact on Community Infrastructure:
    The Redhill Clinic, which provides critical mental health services to adolescents, is slated for displacement without clear plans for relocation. This disproportionately affects adolescents with mental health disabilities, violating the Equality Act’s stipulation that public services should avoid discriminating against those with disabilities. The failure to secure a re-provision of this essential service constitutes a serious oversight in terms of equality impact.
  7. Disregard for Key Community Facilities and Religious Institutions:
    The EIA does not address potential disruptions to religious institutions such as nearby mosques and synagogues, despite acknowledging the high percentage of Muslim and Jewish residents in the area. Furthermore, the Masorti Synagogue and its proximity to the site were not considered in the assessment. The Eruv boundary for the Jewish community is a critical aspect that should be maintained and respected during construction, yet it has not been thoroughly addressed.
  8. Non-Compliance with Transport and Accessibility Guidelines (LTN 1/20):
    The development proposes shared pedestrian and cycle paths that reduce pedestrian safety, especially for visually and hearing-impaired individuals. This violates LTN 1/20, a Department for Transport guidance, which advises against shared paths in areas with high pedestrian and cyclist flows. This oversight in the design disproportionately affects disabled and elderly individuals who rely on safe, segregated pathways.
  9. Air Quality and Dust Concerns During Construction:
    The Environmental Statement included in the EIA acknowledges the risk of dust and air pollution during construction, yet fails to provide sufficient mitigation for vulnerable groups, such as those with respiratory conditions or disabilities. The construction dust radius of 350 meters is likely insufficient to protect the health of nearby residents, which includes sensitive groups like the elderly, children, and those with pre-existing conditions.
  10. Failure to Reassure on Inclusive Public Realm Improvements:
    The EIA’s claim that the proposed development will deliver accessible public realm improvements is unsubstantiated, as no detailed assessment is provided. Issues such as the reduction of resting places, inadequate provision for bus-to-tube interchange, and relocation of bus stops will disproportionately affect people with mobility impairments, violating BS 8300 standards for inclusive design.

In conclusion, the developer’s Equality Impact Assessment is critically flawed, violating several national design standards and failing to meet its obligations under the Public Sector Equality Duty of the Equality Act 2010. These oversights create significant risks for people with protected characteristics, particularly in terms of accessibility, safety, and community inclusion. The assessment requires major revisions to align with regulatory standards and to adequately safeguard the rights and well-being of vulnerable populations.