London Fire Brigade
LFB raised issues over the potential “structural collapse to the blocks of flats” above the garage if there was a fire and said the current application should be considered as a whole.
It said: “The structural integrity of many of the blocks above the bus garage are intrinsically dependent on the structural integrity of the bus garage below.
“The potential for so many EV buses poses risks that are not fully understood by the industry at this point in time.” Read the full comments
The Health and Safety Executive’s (HSE) Gateway 1 response to planning application raises significant concerns regarding fire safety risks associated with the proposed Ballymore development. The report highlights inadequacies in fire safety provisions, particularly regarding the underground electric vehicle (EV) bus garage and the high-rise residential buildings above it. Key issues include insufficient fire compartmentation, evacuation strategies, and fire service access, which pose heightened risks to public safety. The HSE recommends that these critical safety flaws be addressed before the application progresses further. Read the full comments
Greater London Authority (GLA) Stage 1 Report calls for the bus garage to be designed with electric vehicles in mind from the outset or a planning condition be set to require the scheme to be agreed by the local authority, before EV buses can be introduced. Read the full comments
The Environment Agency (EA) objects to the Ballymore development due to significant flood risk and environmental concerns. The proposed plans fail to adequately address the risk of flooding from Deans Brook, with insufficient space allocated for flood storage and inadequate measures for sustainable drainage (SuDS). The development also risks degrading water quality and harming biodiversity in the surrounding area, including protected species in Deans Brook. The EA requires a comprehensive flood risk assessment, robust SuDS implementation, and measures to protect and enhance local biodiversity before the proposal can be deemed acceptable. Read the full comments
The London Wildlife Trust raises strong objections to the Ballymore development, citing significant risks to local biodiversity and green spaces, particularly the Deans Brook Nature Reserve. The proposal lacks adequate measures to protect and enhance habitats for protected species such as bats, amphibians, and slow worms, which are present in the area. It also fails to provide sufficient green infrastructure or demonstrate compliance with biodiversity net gain principles, as required by national and regional policies. The Trust calls for a comprehensive ecological assessment and substantial revisions to prioritize the protection of local wildlife and natural habitats. Read the full comments
The London Borough of Barnet’s Trees team objects to the Ballymore development due to inadequate provisions for tree retention and planting. The proposal involves the removal of significant mature trees, which are vital for local biodiversity, air quality, and urban cooling, without sufficient plans for compensatory planting or long-term management. The development fails to align with Barnet’s tree policies and the Urban Greening Factor requirements of the London Plan, which mandate enhanced green infrastructure in urban projects. The team recommends redesigning the scheme to prioritize tree preservation and ensure compliance with sustainability and ecological standards. Read the full comments
In considering the cumulative effects of the development on the setting of The Railway Hotel, St Margaret’s Parish Church and the Watling Estate Conservation Area, the proposals would undermine the appreciation of the listed buildings and impact negatively on the character and appearance of the houses and open spaces within the conservation area.
The introduction of the large number of very tall buildings, which are seen in a variety of views, would be both apparent and disruptive, such that the viewer would be distracted from appreciating the different heritage assets. This causes a degree of harm to heritage significance. Read the full comments
Impact of the proposals
The proposals are for the comprehensive redevelopment of the site, introducing new
tall buildings up to 29 storeys. Due to their scale, the buildings will be visible in views
both close to the site and further afield, including in the backdrop of a number of heritage assets.
Most impacted by this would be the Railway Hotel. Due to its proximity to the site, the proposed buildings would rise up immediately behind its main elevation when viewed
from Station Road. This would limit the ability to fully appreciate its architecture, and especially its chimneys, thereby causing some harm.
The development also has the potential to detract from the special character of the Watling Estate Conservation Area, with the proposed buildings towering over the low-rise residential buildings in views from within it, causing some harm. Read the full comments
Officers hold strong concerns relating to the following materials matters and currently officers are
unclear how the development shall mitigate the impacts either via on site services and/or financial
contributions payable to the LB of Harrow to assign and provide resources to services the increase
in the population and subsequent service requirements.
- Transport
- Education
- Health impacts
- Leisure and open space impacts
In addition to officers concerns forementioned, members considered the following matters to meet
the threshold for objections.
- Views from Stanmore towards the site
- Gross overdevelopment with the forecast growth of 10,000 people, considered akin to a new
electoral ward. - The need and demand for future services (GP surgeries for example) and wider infrastructure
impacts - Heritage concerns to the outward views and setting impacts from Canons Park Estate and
Edgware High Street Conservation areas - Impacts upon the Chandos Park flooding alleviation scheme.
In addition to the above, reference was made to the recent GLA stage 1 negative response to the suitability of the replacement Bus station.
I trust that the attached report and addendum are helpful and are considered during the developments
assessment. The London Borough of Harrow would reaffirm its significant and strong objection to the
scheme in its current form and view the impacts to have long lasting impact on the eastern wards and
northern wards.
For the avoidance of doubt the LB Harrow strongly objects to the proposed development. Read the full comments
We have reviewed the information provided and cannot recommend approval for the following
reasons:
- MicroDrainage calculations presented in the SuDS Assessment Form use FSR rainfall data, which is obsolete, FEH-13 or later rainfall data should be used instead.
- The SuDS Assessment Form refers to the Drainage Report, with respect to calculations, exceedance flows and operation and maintenance, however the Drainage Report was not available at the time of review. The SuDS assessment form provided lacks sufficient information to allow for a full review of the proposals. Please see the Typical requirements of Surface Water Drainage Strategy section below for further information.
- Confirmation is required from Thames Water that the sewer network can accept proposed discharge rates it is also noted in the FRA that Thames Water state that upgrades to the sewer will be required Confirmation of this commitment will be required.
The Greater London Archaeological Advisory Service (GLAAS)
I advise that the development could cause harm to archaeological remains and field evaluation is needed to determine appropriate mitigation. However, although the NPPF envisages evaluation being undertaken prior to determination, in this case consideration of the nature of the development, the archaeological interest and/or practical constraints are such that I consider a two-stage archaeological condition could provide an acceptable safeguard. This would comprise firstly, evaluation to clarify the nature and extent of surviving remains, followed, if necessary, by a full investigation. Read the full comments