Object to Ballymore Edgware โ€“ GLA Stage 2 | Save Our Edgware
๐Ÿ”ด GLA STAGE 2 IS NOW OPEN โ€” Barnet referred to the Mayor on 20 March 2026. The window to object is open NOW. The Mayor decides on 2 April. Object immediately โ†—
GLA Stage 2 โ€” Mayor of London Decision โ€” OPEN NOW

Submit your objection
to the Mayor of London

Barnet approved this scheme on 23 July 2025 and referred it to the Mayor on 11 March 2026. Stage 2 is open. The Mayor has not yet decided โ€” and he can refuse. Object now.

Submit your objection โ†—
7,038 Objected to Barnet
29 Storeys high
20 Mar Stage 2 opened
๐Ÿ”ด
GLA Stage 2 is NOW OPEN โ€” The Mayor will decide on 2 April

Barnet formally submitted the Stage 2 referral to the Mayor of London on 11 March 2026.The Mayor's window to consider the application and decide whether to allow Barnet to issue consent โ€” or to direct refusal โ€” is now running until 2 April. Please object immediately. Do not wait.

On the same date, Barnet also formally rejected our request to strengthen the Section 106 to protect the bus station โ€” dismissing all five specific safeguards as "reserved matters." Barnet insists the scheme will deliver an "enhanced" interchange. Our passenger-weighted analysis of the applicant's own Transport Assessment data shows the average bus-to-Underground walking distance increasing from 5 metres to 132 metres โ€” a 25-fold increase.

Edgware bus station before and after โ€” existing covered 68-seat station vs proposed dispersed street stops
23 July 2025 Barnet voted to approve โ€” despite 7,038 objections, unresolved fire safety, and a committee report with admitted material errors. Labour councillors voted yes.
11 March 2026 Barnet referred the application to the Mayor of London (Stage 2). On the same day, Barnet rejected all five of Save Our Edgware's requests to strengthen the Section 106 to protect the bus station, dismissing them as "reserved matters."
NOW โ€” Act immediately The Mayor is considering the application. The window for representations is open. Object now at planapps.london.gov.uk

Submit your GLA objection now

Use the GLA planning portal โ€” planapps.london.gov.uk ยท Ref: 24/2686/OUT

๐Ÿ”ฅ

Unresolved fire safety

London Fire Brigade says testing may never prove viability. No building regulations exist for this type of facility.

๐Ÿš

Bus station destroyed โ€” key degradation stats

๐Ÿ“ Walking distance: 5m โ†’ 132m (+2,540%)
โฑ๏ธ MI walking time: 7 sec โ†’ 3 min 39 sec
๐Ÿ‘ฅ Daily passengers affected: 3,390
๐Ÿšฆ New A-road crossings: 10 (previously zero)
๐Ÿ›‘ BS 8300 non-compliant stops: 9 of 12 (75%)
๐Ÿ’บ Enclosed seats secured: 0 (was 68)
๐Ÿฅ Hospital routes worst hit: 107, 186, 251, 303
๐ŸŒ™ Night buses (N5/N32/N113): 170m, exposed, no shelter
โš–๏ธ

Interchange equality gap

Ballymore's general EIA did not assess the specific equality impact of the interchange downgrade on disabled and mobility-impaired passengers โ€” as the GLA's Stage 1 report required.

๐Ÿ—๏ธ

Unlawful decision

Members voted on wrong documents โ€” admitted errors in Appendix references and non-existent Parameter Plans.

๐ŸŒฟ

Habitat loss

Irreplaceable deciduous woodland in a designated SINC will be destroyed with no secured compensation plan.

๐Ÿ™๏ธ

Extreme density

25 towers up to 29 storeys โ€” 23ร— the existing character โ€” with admitted major adverse daylight/sunlight impacts.

Save Our Edgware and the Edgware Community Association submitted a formal Stage 2 objection to the Mayor of London on 17 March 2026. You can read the full submission here.

Feel free to use this or write your own

I object to the Ballymore Edgware Town Centre planning application (ref: 24/2686/OUT) and ask the Mayor of London to refuse it.

Fire safety

The scheme buries a garage for up to 190 electric buses directly beneath 9 residential towers. The London Fire Brigade has warned this poses risks "not fully understood by the industry" and has explicitly said it cannot confirm the scheme is safe for electric buses. No building regulations for this type of underground garage exist anywhere in the UK. Yet the planning permission allows the existing bus garage to be demolished in Year 1, while the underground replacement won't be ready until Year 5. If it never gets safety approval, Edgware will have lost its bus garage permanently.

Bus station

Our analysis of the developer's own Transport Assessment shows that the average bus-to-Underground walking distance will increase from 5 metres to 132 metres โ€” a 25-fold increase โ€” affecting 3,390 passengers every day. Ten new road crossings will be introduced where none currently exist. 75% of the proposed stops don't meet basic accessibility standards. No shelter is guaranteed. The existing enclosed, staffed, 68-seat station โ€” right next to the Tube entrance โ€” will be gone.

Hospital routes serving Edgware Community Hospital, RNOH Stanmore and Northwick Park Hospital are among those most badly affected. Night buses will stop 170 metres from the Underground, with no shelter, after midnight.

The Barnet Local Plan says the bus station must be "protected or re-provided." A 25-fold increase in walking distance is not protection.

Scale and impact

25 towers up to 29 storeys will overshadow 176 neighbouring homes. The developer's own documents describe the daylight and sunlight losses as "major adverse." Irreplaceable woodland in a designated nature conservation site will be destroyed, with no secured plan to replace it.

I urge the Mayor to refuse this application.

The following grounds are drawn from expert legal analysis, the Edgware Community Association's consolidated objections, and our detailed briefings. You do not need to use technical language โ€” write in your own words about what concerns you most. The grounds below give you the facts.

01
Fire Safety ยท Underground Bus Garage
An experiment beneath people's homes โ€” with no proven safety framework
Fire SafetyLegal Ground
โ–พ

The scheme proposes burying a garage for up to 190 electric buses beneath 9 high-rise residential buildings. This has never been done in the UK. There is no proven safety precedent, no established regulatory framework, and โ€” critically โ€” no Approved Document under the Building Regulations Act 2010 that would permit the safe construction of such a facility.

Confirmed by government A letter from the Department for Transport confirmed that no building safety standards for underground EV bus garages currently exist. FOI responses from MHCLG confirm no such regulations are in preparation within the timescale of this development.

The London Fire Brigade, after extensive engagement, remained clear that they could not confirm whether testing would ever demonstrate the scheme is viable for electric buses. Yet Barnet approved demolition, excavation and basement construction from Year 1 โ€” before any fire safety strategy needs to be approved.

  • Condition 17 only prevents use of the garage โ€” it does not stop demolition or excavation. The bus station and garage can be demolished and the basement dug before fire safety is resolved.
  • The replacement underground garage only becomes operational in Year 5, but the existing surface garage can be demolished in Q4 Year 1.
  • The developer's own director told the Committee: "No spade will hit the ground until the fire safety strategy is agreed." This assurance is not reflected anywhere in the planning conditions.
Suggested wording for your objection "I object to this scheme because the underground electric bus garage has no proven safety precedent in the UK, no applicable building regulations exist, and the London Fire Brigade has been unable to confirm the scheme is viable. The planning permission allows irreversible demolition and excavation to proceed before any fire safety strategy needs to be approved. This is an unacceptable experiment beneath thousands of homes."
02
Transport ยท Bus Station
A 25-fold increase in walking distance โ€” and Barnet calls it an "enhancement"
TransportEqualityLocal Plan
โ–พ

Edgware is one of the busiest bus interchanges in North London, serving approximately 20 routes and 23,000 daily passenger movements. The existing station has 18 stands in a covered, staffed, enclosed environment directly adjacent to the Underground entrance. All buses currently alight at Stop G โ€” just 5 metres from the Underground entrance, within a protected off-street concourse with no road to cross.

Passenger-weighted analysis of the applicant's own Transport Assessment data Covering 3,390 daily interchange passengers, our analysis shows the passenger-weighted average bus-to-Underground walking distance increasing from 5 metres to 132 metres โ€” a 25-fold increase (+2,540%). Walking time for mobility-impaired users rises from 7 seconds to 3 minutes 39 seconds. By route: GN2 (Approach Road) serves Routes 32, 79, 204, 251, 303, 340 โ€” 170 metres from the Underground entrance. GS2 (Station Road northbound) serves Routes 107, 113, 221, 240, 384 โ€” 94 metres away. The applicant's own Transport Assessment Addendum (Section 5.3.5) acknowledges "the proposed bus station arrangements would result in increased walking distances for bus to LU interchanges." Zero shelter provision is legally secured at outline stage.

Despite this, on 11 March 2026 Barnet formally stated it "does not agree" the scheme represents a downgrade, maintaining that its "intention is to secure an enhanced public transport interchange." This position is directly contradicted by the applicant's own data.

The scheme also introduces five specific new operational hazards that do not exist in the current bus station:

  • 10 new A-road crossing movements introduced where none currently exist โ€” 746 daily passengers will cross the A5109 Station Road, facing average signal delays of 29 seconds (up from 8 seconds). GN2 passengers face two consecutive A-road crossings per interchange trip.
  • Stand F2 stacking risk: The stand is too short for two buses โ€” a second bus may block a pedestrian crossing, creating an avoidable collision hazard.
  • GS2 termination failure: Five routes proposed to terminate at a stop accommodating only one bus โ€” carriageway obstruction is foreseeable at peak times.
  • 4-stop sequential conflict: Buses must stop to turn, stop at a crossing, stop at a stand, then stop to merge back onto Station Road โ€” a sequence that does not exist in the current off-road station.
  • 75% of proposed stops breach BS 8300 accessibility thresholds โ€” 9 of 12 stops exceed the 50-metre covered rest provision threshold. The existing station has zero non-compliant stops.
Barnet Local Plan โ€” binding requirement The adopted Barnet Local Plan 2021โ€“2036 expressly requires: "Interchange improvements at Edgware with protection or re-provision of bus operations and bus station function as part of any redevelopment." A 25-fold increase in average interchange walking distance cannot reasonably constitute an interchange improvement. This is a direct conflict with the development plan under section 38(6) of the Planning and Compulsory Purchase Act 2004.
Suggested wording for your objection "Our analysis of the applicant's own Transport Assessment data, covering 3,390 daily interchange passengers, shows the average bus-to-Underground walking distance increasing from 5 metres to 132 metres โ€” a 25-fold increase. Walking time for mobility-impaired users rises from 7 seconds to over 3 minutes. Ten new A-road crossings are introduced where none currently exist. 75% of the proposed stops breach BS 8300 accessibility thresholds. Barnet calls this an enhancement. The Barnet Local Plan requires protection or re-provision of bus station function. A 25-fold increase in walking distance is not protection โ€” it is a fundamental downgrade. The Mayor should refuse this scheme."
03
Equality ยท Public Sector Equality Duty
The equality impact of the interchange downgrade was not properly assessed
Equality Act 2010PSED
โ–พ

Ballymore carried out a general Equalities Impact Assessment for the scheme. However, the specific equality impacts of the interchange downgrade โ€” quantified in our passenger-weighted analysis โ€” were not assessed for disabled and mobility-impaired users. The GLA's Stage 1 Report required exactly this: "an assessment of impact on their journeys, and confirmation of how this change is mitigated through design." It was never provided.

  • The applicant's VisWalk modelling used generic London-wide TfL assumptions โ€” no station-specific demographic data was applied to the 25-fold increase in interchange walking distance.
  • The hospital and elderly-residential routes are the most severely affected. The D2โ†’J movement (Routes 186/288/292 โ†” 251/303 serving Edgware Community Hospital) sees walking time for mobility-impaired users increase by over 1,000%. Route 107 to RNOH Stanmore, Route 186 to Northwick Park Hospital, and Routes 221/240 serving elderly residential corridors are all significantly worse.
  • Night services N5, N32 and N113 will terminate at GN2 โ€” 170 metres on-street, fully exposed, no shelter secured, post-midnight.
  • At the BS 8300:2018 mobility-impaired walking speed of 0.7 m/s, a 20โ€“25 second signal phase permits only 14โ€“17 metres of travel. The multi-lane A5109 Station Road crossings now required have not been assessed for crossing-time adequacy.
  • Passenger facilities โ€” shelter, seating, staffing โ€” remain entirely undefined at outline stage, making a meaningful equality assessment impossible.
Suggested wording "Ballymore produced a general equalities assessment, but did not specifically assess the impact of a 25-fold increase in interchange walking distance on disabled, elderly and mobility-impaired passengers. Hospital routes serving Edgware Community Hospital, RNOH Stanmore and Northwick Park are among the worst affected. Night buses will terminate 170 metres from the Underground, fully exposed, with no shelter secured. The GLA required this station-specific equality assessment at outline stage. It was never provided."
04
Procedural ยท Decision-Making
Barnet voted on wrong documents โ€” a procedurally unlawful decision
Procedural UnlawfulnessJudicial Review
โ–พ

The Barnet committee report contained multiple admitted errors of a legally material nature. Members voted to approve the scheme without access to accurate information about what they were approving.

  • Wrong Appendix: The Officer's Report and formal Recommendation repeatedly stated that approval was subject to conditions "set out in Appendix 1." Appendix 1 contains no conditions at all โ€” it is a one-page EIA document. The conditions were in Appendix 2. This was later admitted by the Planning Performance & Development Manager.
  • Non-existent Parameter Plans: The conditions controlling demolition, phasing and early basement excavation referred to incorrect and in some cases non-existent parameter plan numbers. Members could not know what drawings governed the demolition sequencing they were being asked to approve.
  • Post-vote "corrections": The Council acknowledged these errors after the vote but proposed to fix them through the final Decision Notice rather than returning to Committee. A local planning authority cannot retrospectively cure a defect in the decision-making process after the vote has been taken.
  • False assurance: The developer's director told Members "no spade will hit the ground until fire safety is agreed." This is directly contradicted by the permission as approved. Members who voted in favour expressly relied on that assurance.
Confirmed in writing By email dated 2 February 2026, Barnet Council expressly admitted that the draft conditions referenced incorrect and non-existent parameter plan numbers at the time of the vote.
Suggested wording "Barnet's approval was procedurally flawed. Members were directed to the wrong Appendix for the planning conditions. The parameter plans controlling demolition were non-existent at the time of the vote โ€” an error later admitted in writing. The developer gave an assurance that no demolition would start before fire safety was approved โ€” an assurance not reflected anywhere in the conditions. The Mayor should not rubber-stamp a decision that was taken on such a demonstrably false basis."
05
Environmental ยท Biodiversity
Irreplaceable woodland and wildlife habitat will be permanently destroyed
BiodiversityNPPF ยง193
โ–พ

The site contains designated lowland deciduous woodland within the Deans Brook and Stoneyfields Park Site of Importance for Nature Conservation (SINC) โ€” a protected ecological designation.

  • The scheme will destroy irreplaceable habitat within the SINC, contrary to NPPF paragraph 193 which prohibits such loss unless there are "wholly exceptional reasons."
  • Schedule 7A of the Environment Act 2021 requires a Biodiversity Net Gain Plan to be in place at the time of the decision. No such plan is secured.
  • London Plan Policies G6 and G7 require protection of London's biodiversity and urban forests. The applicant's own environmental consultants acknowledge this habitat loss is "not in line" with these policies.
  • Protected and Schedule 1 species are present: slow-worms, bats using trees for roosting, nesting birds including Schedule 1 species, and common amphibians in the SINC pond.
  • Barnet has deferred all biodiversity net gain mitigation and off-site habitat delivery to future Reserved Matters, without any secured mechanism, habitat banking, or BNG credits.
  • The proposed cycle path through the SINC will fragment habitat, increase disturbance, and expose wildlife to predation โ€” with no adequate mitigation plan.
Suggested wording "The scheme permanently destroys irreplaceable woodland in a designated Site of Importance for Nature Conservation, with protected species present including slow-worms, bats and Schedule 1 birds. Barnet has approved this without a single secured biodiversity net gain commitment. The Environment Act 2021 does not permit this. The Mayor must refuse."
06
Scale ยท Daylight ยท Sunlight
Extreme height and density โ€” with admitted major adverse impacts on neighbours
Height & DensityLondon Plan D9
โ–พ

The scheme proposes 25 buildings up to 29 storeys โ€” a density approximately 23 times the existing character of the area โ€” making it one of the densest residential developments anywhere in outer London.

  • The applicant's own Environmental Statement acknowledges the towers will cause "major adverse" daylight and sunlight losses to many neighbouring homes, in breach of BRE Guidelines.
  • London Plan Policy D9 and the Barnet Local Plan require such harm to be fully justified against clear, strategic public benefit, and mitigated wherever feasible. No such justification is made.
  • Barnet failed to demonstrate how the acknowledged major losses to private homes are outweighed by the scheme's benefits โ€” particularly when those benefits (fire safety, biodiversity, transport continuity) are themselves unresolved.
  • At this density, any failure in fire safety, infrastructure or quality of life is uncontainable. There is no margin for error.
  • Infrastructure capacity for schools, healthcare and open space for 10,000 additional residents has not been demonstrated.
Suggested wording "25 towers up to 29 storeys will cast 'major adverse' shadows on neighbouring homes โ€” the developer's own words. Barnet has never explained how this harm is outweighed by the benefits, particularly when the benefits themselves (fire safety, transport continuity, biodiversity) are all unresolved. This scale of development is inappropriate for outer London and should be refused."
07
Town Centre ยท Viability
Edgware as a Major Town Centre will be irreversibly weakened
Town CentreRetail
โ–พ

Edgware's town centre currently functions because of its combination of transport hub, covered shopping centre, diverse retail, and accessible parking. This scheme dismantles all four simultaneously.

  • Retail cut by nearly 50% (excluding food) โ€” Broadwalk Shopping Centre demolished and not meaningfully replaced.
  • Public parking reduced by over 76% โ€” removing accessibility for the wide catchment Edgware serves, including elderly residents, people with disabilities, and those without access to the Underground.
  • Shops at ground-floor level beneath towers do not replicate the function, footfall or community role of a covered shopping centre.
  • The scheme admits the town centre's retail role will be weakened for the entire duration of construction โ€” many years โ€” with no secured plan to prevent irreversible trade and footfall decline.
  • The scheme is not currently considered financially deliverable without a ยฃ41.5 million CIL infrastructure reinvestment. Barnet's own Cabinet report states the scheme "would not be deliverable" without this public subsidy โ€” yet there is no guarantee that the development will be built out as planned.
Barnet's own Cabinet report (June 2025) "The scheme is currently not considered by the viability specialists to be deliverable... Without the application of ยฃ41.5 million... the scheme would not be deliverable." (Appendix 3 โ€” CIL Infrastructure Reinvestment Agreement)
Suggested wording "Edgware's role as a Major Town Centre depends on its retail, parking and transport hub working together. This scheme destroys the shopping centre, removes 76% of parking, and degrades the bus interchange. Retail floorspace falls by nearly 50%. Barnet's own financial advisers say the scheme is not deliverable without a ยฃ41.5 million public subsidy. The Mayor should refuse a scheme that is simultaneously undeliverable and destructive."
08
Community Impact ยท Local Identity
A diverse community with protected characteristics โ€” inadequately assessed
CommunityReligious Impact
โ–พ

Edgware has a uniquely diverse religious and cultural community. The Equalities Impact Assessment has failed to engage meaningfully with protected groups that will be most affected.

  • Edgware serves as a major hub for the Jewish community (17% of local population), with specialist kosher shops and religious facilities concentrated in the town centre. The EIA does not assess the impact on access to these facilities.
  • The Muslim (15%) and Hindu (8%) communities were not meaningfully consulted regarding impacts on access to religious spaces and parking for religious observance.
  • Neurodivergent residents and those supported by disability organisations (e.g. Kisharon Langdon, based nearby) were not consulted โ€” a direct failure of the PSED's requirement to "foster good relations."
  • The EIA fails to address the impact of years of construction noise, dust and disruption on neurosensory disabilities, in breach of London Plan Policy D7.
Suggested wording "Edgware's town centre serves one of London's most distinctive and diverse communities โ€” including large Jewish, Muslim and Hindu populations, and specialist services for people with disabilities. The Equalities Impact Assessment did not consult these communities, did not assess impacts on religious facilities, and failed the Public Sector Equality Duty. The Mayor should require a full and lawful equalities assessment before any decision is made."

The following statutory consultees and expert bodies raised serious objections or unresolved concerns during the Barnet process. Their submissions remain on the record and the Mayor must give them full weight.

๐Ÿ”ฅ London Fire Brigade

Raised concerns about "structural collapse" of residential blocks above the garage in a fire event. Said the risks from EV buses at this scale "are not fully understood by the industry." Remained unclear after further engagement whether testing would ever demonstrate viability.

โš ๏ธ Health & Safety Executive

Identified inadequate fire compartmentation, evacuation strategies and fire service access. Recommended critical safety flaws be addressed before the application progressed further.

๐ŸŒŠ Environment Agency

Objected due to significant flood risk from Deans Brook, insufficient flood storage space, inadequate sustainable drainage, and risks to water quality and protected species.

๐Ÿ›๏ธ Historic England

Found the proposals would cause harm to the Railway Hotel (Grade II listed), and to the Watling Estate and Canons Park Conservation Areas, through their height and visual dominance.

๐ŸŒฟ London Wildlife Trust

Raised strong objections over risks to Deans Brook Nature Reserve, failure to protect bats, amphibians and slow worms, and inadequate biodiversity net gain measures.

๐Ÿ™๏ธ London Borough of Harrow

Strongly objected on grounds of gross overdevelopment, transport, education, health, heritage impacts, views from Stanmore and Canons Park, and the inadequacy of the replacement bus station โ€” citing the GLA Stage 1 negative response on this point.

โœ“ Use your own words

Identical form letters are given less weight. Even a short personal statement about how the scheme will affect your life matters.

โœ“ State your connection to Edgware

Are you a resident, commuter, disabled user, business owner, parent? Tell them. It shows who the real people are behind the objection number.

โœ“ Focus on planning grounds

Pick 1โ€“2 of the grounds above that concern you most. You don't need to cover everything โ€” specificity is more powerful than length.

โœ— Don't just say "I object"

Give reasons โ€” even simple ones. "The bus station serves my elderly mother who uses a wheelchair" is a valid and powerful planning ground.

โœ“ Refer to London Plan policies if you can

Policies T3 (transport hubs), D9 (tall buildings), G6/G7 (biodiversity), D5 (inclusive design) are particularly relevant.

โœ— Don't worry about being an expert

Planning inspectors and the Mayor's officers read thousands of local representations. You do not need legal language to be taken seriously.

Stage 2 is open.
Object today.

Barnet referred to the Mayor on 11 March 2026. The window is open now. The Mayor has not yet decided. Make your voice heard before it closes.

planapps.london.gov.uk/planningapps/24-2686-OUT

Save Our Edgware ยท saveouredgware.co.uk