Lead Petitioner Anuta Zack presented the ‘Save Edgware Now’ petition on 17 Oct 2023 at the full Barnet Council meeting

Watch the presentation here:

“Madam Mayor,
Councillors, ladies and gentlemen, thank you for allowing us to present our petition
and to speak at this Meeting.
The petition has over 5,500 signatures representing local residents concerns and
objections to Ballymore and TFL proposed Master Plan.
This would be the biggest change to Edgware in 100 years, but unlike the arrival of
the underground it brings no progress. It will in fact disadvantage the disabled, elderly
and vulnerable.
Edgware as a functioning town would be decimated, we would lose our bus station,
our covered shopping centre, our only car park and gain one of the densest, if not the
densest, developments in the country with no clear plans for supporting infrastructure.
That the council may receive money to support infrastructure is meaningless without
a clear costed accompanying plan to show how it will be used to address the issues
created by the development.
Edgware Town Centre presently has almost no vacant shops. The Broadwalk, a
covered shopping centre, is fully let and we are uniquely well served with banking
facilities in the town. We have a car park with over 1000 public spaces and 200 staff
spaces.
We have a manned bus station that is fully enclosed, well-lit, has 68 seats, a
refreshment kiosk, indicator boards and is less than a minute’s covered walk from the
tube station. It is a safe, well lit, secure protected space for the elderly and vulnerable.
Indeed, Edgware is doing better than a great deal of towns locally and nationally.
What is proposed is to create the UKs first electric underground bus garage, with a
bottleneck design.
There are currently no established safety protocols, and no one can provide
reassurance about the fire risks of electric vehicles and thermal runways. In short,
Edgware’s new bus garage will be an experiment with 10,000 people proposed to

sleep above it! This has understandably created great anxiety especially considering
the Grenfell cladding at Premier House.
The bus station is to be demolished and instead, there will be several open-air bus
stops dotted around Station Road and the deceptively labelled “Station Square” which
is really a shallow bus gyratory roundabout. Station Road will lose a significant number
of its parking spaces. This will decrease security and convenience and increase traffic
and congestion.
Edgware’s transport interchange currently benefits from a much used and valued pick
up/drop off point which is being lost. If replaced at all it will be out of sight of the station
and caught in a one-way system.
Ballymore/TFL propose 3828 units on a 7.2 hectares site equating to a population
density of 139,000 people per sq. km. The present densest development in the UK is
in Millharbour, Docklands, at 90,000 people per sq. km. The population density of
Hong Kong is 110,000 people per sq. km for context.
The sheer scale, mass and density is at an unprecedented scale and doesn’t follow
what is deemed best practice environmentally.
This GROSS OVERDEVELOPMENT, is informed by the Edgware Growth Area
SPD. This policy was passed in 2021 during covid and lockdown with the engagement
of 219 people in a town of close to 80,000. We cannot believe that the required level
of consultation for major changes in policy was met in this case.
Cabinet Office consultation principals, updated in 2018, require public bodies to make
clear concise targeted consultations and this just did not happen here.
The National Planning Policy Framework, which governs ALL new development in the
UK maintains, in Section 11b, a presumption that new buildings should not be “at
densities significantly out of character with the existing area”. Surely there couldn’t be
a clearer contravention of this principle?
Now, instead of the Broadwalk car park, the only public car park there will be 250
Sainsburys spaces below the relocated store, usually 500 for a full-sized food
superstore.
The 10,000 new residents will have 425 dedicated parking spaces.
There will be no staff parking meaning the space designated even for a potential
medical centre comes with no parking.
So how many other car parking spaces will there be left to serve ALL the existing
Edgware residents, ALL the shoppers and ALL the commuters and All the visitors? 94.
This for a catchment area Barnet Council put at 400,000 in 2013.
How many of the existing retailers will survive over 10 years of disruption this scheme
will create, and the loss of car parking? We fear not many.

Far from this being the proclaimed REGENERATION of Edgware, it is likely to be the
death-knell of our Town Centre.
On behalf of the 5,500 plus signatories to the petition, thank you for listening to us and
please do the right thing by Edgware.”

ePetition details

https://barnet.moderngov.co.uk/mgEPetitionDisplay.aspx?ID=261&RPID=30172069&HPID=30172069

Save Edgware Now

We the undersigned petition the council to We need Barnet Council and the
Mayor for London to be convinced that these proposals are in fact a gross
overdevelopment, totally out of keeping with the character of Edgware and the
maximum they should permit here is a development of about a quarter of this
density, whilst insisting that the shopping facilities are replaced, that there is
more parking, and provision of the necessary supporting infrastructure
including schools, doctor’s surgeries, etc. and with buildings considerably
lower than those proposed.
If Barnet Council decide to grant planning permission for this development proposal,
which is at a density far in excess of what they have already permitted in Colindale in
recent years, and it does indeed go ahead, the suburban character of Central
Edgware will be lost forever, and instead replaced with a mini-Manhattan, no doubt
at great profit to the developers, but at huge cost to the standard of living of local
residents.
This ePetition runs from 05/09/2023 to 17/11/2023.
3501 people have signed this ePetition.

Council response


Reported to Full Council (excluding Annual Council)
The petition will be considered by Full Council and the following process will be
followed:

  • Lead Petitioner is given five minutes to present the petition;
  • Council Members have an opportunity to ask questions of the Lead Petitioner
    then debate the item;
  • The relevant Cabinet Member or Committee Chair will respond to the issues
    raised in the petition and outline the decision route (if any) he/she proposes to
    take which may include:
    Option 1: Take no action
    Option 2: Provide a written respond to Lead Petitioner within 20 working
    days; or
    Option 3: Instruct an officer to prepare a report for a future meeting of Cabinet or
    a Committee on the issue(s) raised with a recommended course of action

    Note: Option 3 was unanimously voted through by the Barnet council